• Monthl~Invoices that must include a breakdown of hours worked, by whom, and their title; <br /> and - - - <br /> • Written minutes are to be provided to Agency within ten (10) days from each meeting. <br /> Meeting minutes must include: <br /> ¦ Discussion summary; <br /> • Material written on meeting room white board; and <br /> Next Steps. <br /> , <br /> TO~LC Cti lUrl , <br /> • Contractor shall contact Agency, other Contractors, and, other agency staff to gather <br /> information on the project, project site, regulations and.guidance, unless directed otherwise, <br /> including: <br /> • Direct communication via phone, email, post, and office visits; <br /> • Meeting attendance; and <br /> • Arrange and attend joint field visits. <br /> • Prepare a'#ile for the project .containing the .following: <br /> • Record of all contacts with Agency, other agency, and other Contractor staff; <br /> • Summary of important information, decisions and guidance received; <br /> • Relevant portions of project meeting minutes; and <br /> • Copies of all correspondence. <br /> _,__.2 >.T~1~E~erles <br /> Contractor shall:. <br /> • Coordinate with appropriate contacts; and <br /> • Prepare and maintain a project file. <br /> <br /> ~ ~ ~ 'as1~2 ~ Sco~i I~~nh~rc~ali~rr, crf ~~ch~~ c~ric<il R~sotii ccs thxoug~ ; l~zcl~~~a <br /> .~'c ~ r5 S~~~rclr ai~;d Ta~~` - ~ ~iclf li 1' c~niaass~rizc~ <br /> The purpose of Task 2 is to identify archaeological resources that may be affected during the - <br /> proposed.transportation project. The Baseline/Reconnaissance Report is a scoping report, not a <br /> technical report, and will be used to help design construction alternatives and determine the <br /> extent of a Phase 1 Technical Survey and. Report, if requested by Agency. <br /> The Baseline/Reconnaissance Report required under this !task. shall..indude a descriptionof-the <br /> area of potential impact (API), a detailed project description, .detailed historical context and <br /> ethno-historical information, methodology, recommendations for future work, a .summary, <br /> detailed. bibliography, maps, and photos. Please refer to the archaeology guidelines available on <br /> the Agency FTP site. <br /> Minor Transportation Projects, as defined in Agency's Programmatic Agreement with SHI'O (see <br /> . Task 3.1), are excluded under Task 2. If a site is located within the API and Agency is unable to <br /> avoid the area, then further examination will be necessary through Phase 1 survey, sub-surface <br /> probing, and possibly Phase 2 Archaeological testing. <br /> As part of preparing a Baseline/Reconnaissance Report, Contractor shall conduct: <br /> Archaeology Scope of Work <br /> <br />