B. GENERAL CONTRACTOR REQUIREMEL~LTS AND OUTLINE OF SOW TASKS <br /> Contractor shall prepare all documents based on standard guidance in the style and format of <br /> sample documents provided by the Oregon Department of Transportation and/or Agency . <br /> (ftp://ftp.odotstate.or.us/techserv/Geo-Environmental/Environmental/) or -based on the reporting <br /> standards and guidelines provided on the Oregon State Historic Preservation Office (SHPO) <br /> website. Contractor is the Professional of Record for the work, which shall be executed by <br /> Contractor's qualified archaeologist or other qualified professional. Contractor shall be responsible <br /> for determining applicable ODOT/SHPO practices and standards to be used in performing the <br /> work. Contractor shall be responsible for obtaining all necessary state and/or federal excavation <br /> permits, in accordance with ORS 390.235 and the Archaeological Resources Protection Act. <br /> Agency will not accept or compensate for unrequested reports or Contractor -work that is <br /> submitted in other format styles and will return them to Contractor for revision in the correct <br /> format of Contractor's expense. <br /> Contractor's Qualified Archaeologist shall coordinate with SHPO, as necessary, regarding <br /> documents (research) and shall coordinate with Agency Archaeological Staff to make necessary <br /> changes to Final documents to satisfy SHPO and Agency requirements. Agency will transmit <br /> Final documents to regulators on Agency letterhead. <br /> Section 106 of the NHPA must be followed when atransportation-related project involves a <br /> federal nexus (i.e., federal land, federal money, or when federal permits are' required). Contractor <br /> shall consult with Agency Archeology staff for questions about whether a federal. nexus exists. <br /> These projects will require an archaeological resources evaluation consisting of pedestrian <br /> surveys and/or sub-surface testing. State-funded projects and/or projects involving state/private <br /> lands also require an .archaeological resources .evaluation (pedestrian surveys and/or sub-surface <br /> testing). as dictated in ORS 358.653, 358.640, and 358.920. Furthermore, the Agency's policy is to <br /> follow the Section 106 process for all transportation projects. <br /> Agency will transmit Final documents to regulators on Agency letterhead. <br /> Agency will provide project descriptions, maps and agency contact personnel information to <br /> Contractor once the Notice to Proceed (NTP) -date has been determined. <br /> This SOW is comprised of the following tasks: - <br /> Task 1 Pro'ect Mana ement <br /> Task 2 Prepare Scoping, Archaeological Field ,Survey, Records Search <br /> and Baseline/Reconnaissance Re ort <br /> Task 3 Provide Programmatic A e'ement Memorandum to A envy <br /> Task 4 Pro'ect Close=Out <br /> C. GENERAL ASSUMPTIONS AND REQUIRTMENTS APPLICABLE TO ALL TASKS AND . <br /> CONTINGENCY TASKS <br /> <br /> Archaeology Scope of Work <br /> _ _ _ <br /> <br />