City. of Eugene Contract #2009-00831 <br /> _ . <br /> Exhibit B <br /> SCOPE OF WORK AND COST ESTIMATE <br /> Project Name: Key Number 14709- West Bank Trail Extension: River Avenue - <br /> Beaver Street (Eugene) <br /> City job #4279 <br /> A. BACKGROUND AND PROJECT DESCRIPTION <br /> The purpose of this Scope of Work (SOW) is to help the City of Eugene ("Agency") satisfy the <br /> requirements of Section 106 of the National Historic Preservation Act (NHPA), Section 4(f) of the <br /> Department of Transportation Act, Oregon Revised Statutes (ORS) 358.640, 358.920, 358.653, <br /> 390.235 and the Archaeological Resources Protection Act. This work must be conducted by an <br /> Archaeologist who .meets the Secretary of Interior's Professional Qualification Standards of 36 <br /> CFR Part 61 Appendix A iri the field of Archaeology. Under this SOW, Contractor shall prepare <br /> Archaeology Baseline (or Phase One) Report, a Programmatic Agreement (PA) Memorandum for <br /> a Minor Transportation Project and any contingency tasks authorized in writing by Agency. <br /> #ion: <br /> pis project is located in North Eugene connecting; the existing West Bank"Frailto the--south <br /> ssingunder Bcltline. Ijightivay and connecting on thenorth end to P,ewcr Street . The proje~_t <br /> location may be more specifically described as'Inwnshi~? 17 South, Pange 4West, Sections 7~ and. <br /> 1 W.M. in Lane Corinty. <br /> roject Description: <br /> he Crity of Eugenie has obtained fede.ra] transportatianftu~ds for this project. West bank Frail <br /> =Extension is in design udder the Local Federal-,Aid Project "West Bank'T'rail Gxtensio~~: Pit'crr <br /> i1 ~r~ue -Beaver Street (Eugene)„ (Ke}~ No. 147[9). , <br /> his; pmject ~~~ill construct a multi-use paUl extension to provide co~inect~ivity between <br /> ~~ighborhoods nordz of l3eltline f ]i~htiti~ay, arld ~-vest of the Willamette .Giver; .and the West Ban <br /> iJ systei~~ to the South of I3eltline Hi~hw~zy, <br /> proposed path ~4~i11 be 12' wide, constructed or c oricretc~, and ~1~ill Piave path lighting. Asp <br /> 5hoi>>n on the zi~ap, pro~~~ided ~ti>ith the sapping n~ceting invitation, the pai~~ alignr~le~lt ~~rill <br /> nect to the existing 1~Ve~t Bank Trail apf~ro~imatcly 8~0-feet south of i~eltlinc~ Fli~hlvay, it wiI1F <br /> run north alon; the bank of the V1~i]lamette River under Beltline lligh~~~ay; and then turn west <br /> <br /> ~ind ~~roceed along the north side. of Di~>ision Ave. to the connection ~t Beaver 5t. In addition a lei <br /> <br /> 'will he~,f~structed from the intersection o1 P.ivci ~'we. and the Beltline T3_wy. can-ramp to the east' <br /> a <br /> he nci~ti~ trailtion along; the rnk <br /> - _ - ~ a <br /> Archaeology Scope of Work <br /> <br />