<br />Rev SDC project <br />funding.doc (5... <br />SMITH Tammy D <br />From:SCHOENING Mark A <br />Sent:Thursday, January 22, 2009 8:48 AM <br />To:GUBANIKHIN Pavel E <br />Cc:RISDAL Lacey L; SMITH Tammy D <br />Subject:Changes to the draft CIP due to decline in SDC revenues <br />Attachments:Rev SDC project funding.doc <br />Pavel, <br />We have significantly lowered the projected revenue from system development charges over the six-year horizon <br />of the capital improvement program as a result of the severe decline in building permit activity. The attached <br />spreadsheet shows the changes in the stormwater, transportation and wastewater SDC funded projects as a result <br />of the reduced revenue. Lacey will be providing you with similar information for park projects. <br />Mark Schoening, P.E. <br />City Engineer <br />City of Eugene <br />Public Works Engineering <br />(541) 682-5243 <br />PW Engineering staff previously located at the Eugene Hotel and 858 Pearl St have moved to the 3rd and <br />4th floor of the Wells Fargo building located at the corner of Oak & Broadway. All phone and fax numbers, <br />and division e-mail addresses will remain the same. Reception services are now located on 4th floor. <br />1 <br />