New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2.32 Internal Communication
COE
>
PW
>
Admin
>
PW Human Resources
>
APWA Accreditation 2004
>
2.32 Internal Communication
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2010 2:47:38 PM
Creation date
1/8/2009 1:26:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Certification
PW_Subject
PWA Certficication
Document_Date
7/1/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> WASTEWATER DIVISION PAGE 5 <br /> EQUIPMENT MAINTENANCE <br /> Equipment Maintenance successfully managed the Divi- and over 340 feet of drive chain in each channel. In addi- <br /> sion's corrective maintenance (CM) and preventative main- tion to this routine work, Equipment Maintenance rede§- <br /> tenance (PM) programs for 2003. The result of this mainte- igned the out-dated and failing bearing mount system for the <br /> nance activity, in conjunction with a dedicated Operations upper drive shaft in each channel and replaced it with a <br /> staff, was that the Division experienced no permit violations modern, more reliable, less expensive, and easier to repair <br /> due to equipment failure for the year. To help accomplish system. The total mechanical maintenance cost of these two <br /> this outcome the Equipment Maintenance work section suc- projects was $71,656.00. Furthermore, during this rebuild <br /> cessfully processed (closed) 4,946 work orders as follows: cycle additional work was completed by contract through <br /> Facility Maintenance to repair extensive concrete damage <br /> 190 Priority 2 (Quick) Work Orders (4% oftotal) and re-seal each channel. <br /> 401 Priority 3 (Planned & Scheduled) Work Orders <br /> (>8%oftotal) The mechanical rebuild of each Primary and Secondary <br /> 249 Priority 4 (Planned & Scheduled w/ Due Date) Clarifier is an extensive and coordinated effort between the <br /> Work Orders (5%oftotal) Equipment Maintenance work section and a contracted <br /> 17 Priority 5 (Routine) Work Orders (<1%oftotal) (large) crane service. The Equipment Maintenance work <br /> 3,850 Priority 6 (Preventative Maintenance) Work Orders section, with assistance from Oldham Crane Service, re- <br /> (78% oftotal) moved and replaced the bridge assemblies form each clari- <br /> 180 Priority 7 (High Priority) Work Orders fier, removed and replaced the center assembly from each <br /> (3%oftotal) clarifier, and Equipment Maintenance rebuilt each of the <br /> 59 Priority 9 (Emergency) Work Orders (1% of) clarifier main gearbox drives, as well as either rebuilding or <br /> replacing the smaller gearboxes. This work included having <br /> 4,946 Total (100%) anew pinion gear assembly machined by a local machine <br /> shop for one clarifier drive (less than half the cost of an <br /> OEM part), and the extensive construction and use of safety <br /> The WWD performance goal assigned to Equipment Main- scaffolding on the Secondary Clarifier. The total mechani- <br /> tenance for planned vs. unplanned (emergency) mainte- cal maintenance cost of these two projects was $17,983.00. <br /> nance work is 90% planned work / 10% unplanned work. <br /> At 1% unplanned work (priority 9 work orders), the work In 2003 the Equipment Maintenance work section, with help <br /> section's 2003 performance was well above target. from the WWD Hazardous Waste Administrator (otherwise <br /> known as Todd Anderson) completed the transition, started <br /> Of the routine (priority 5) work orders mentioned above, two years earlier, from solvent based parts cleaners and <br /> several were large gear-drive and process-conveyance sand-blasting sand that could not pass a TCLP test fresh <br /> equipment mechanical rebuild projects routinely performed from the manufacturer, to aqueous parts cleaners and metal <br /> on about seven (7) year cycles. These were the mechanical free glass-beads for our sand-blast cabinet. The Mainte- <br /> rebuild of two (2) Pretreatment Grit Channels (WO # 47787 nance Shops are now virtually solvent-free, at least for bulk <br /> and 47788), resulting in the completion of the seven-year cleaning on a day-to-day basis. We only purchase bulk sol- <br /> cycle for all of this type equipment; the mechanical rebuild vents for parts cleaning operations on an as-needed basis, <br /> of one (1) Primary Clarifier (WO # 49990), resulting in the and then only in very small quantities (5 gallons or less). <br /> completion of the seven-year cycle for all of this type equip- Both the aqueous cleaning solutions for the parts washers <br /> merit; and the mechanical rebuild of one (1) Secondary and glass-beads for the sand-blast cabinet are changed-out <br /> Clarifier (WO # 48330), resulting in half of the seven-year on a monthly basis. This allows us to remain below pre- <br /> cycle being completed for all of this type equipment. The ferred levels of oil/grease contaminate discharges for our <br /> rebuild of each Pretreatment Grit Channel is an extensive aqueous parts cleaners, and well below required TCLP con- <br /> and coordinated effort between Equipment Maintenance taminate levels for the sand-blast cabinet. <br /> and, depending on circumstances, the Facilities Mainte- <br /> nance work section and/or contractors. The Equipment L A R R Y P E D E R S E N <br /> Maintenance work section, in conjunction with Facilities <br /> and their improved crane-truck capabilities (eliminating the <br /> need and expense for a contracted crane service for this type <br /> work), removed and replaced (with new) all of the mechani- <br /> cal parts to each of the two grit channels. This included <br /> large drive shafting and gears, 32 grit-conveyance flights, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.