A B C D E F H 1 J K L
<br />1 AS BID CORP BREAKOUT 10-4-02 .'
<br />~
<br />2 TOTAL PROJECT AS-81D COE•REC/PATH ELIGIBLE WORK COMPLETE
<br />3 AS OF 11-1-02
<br />4 NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT
<br />5
<br />6 MOBILI ZATION AND TRAFFIC CONTROL
<br />7
<br />8 10 ON-THE-JOB TRAINING HOUR 500.00 1.00 500.00
<br />9 20 MOBILIZATION LS 1.00 85,822.00 85,822.00 0.234363 20,113.46 0.234363 20,113.46
<br />10 30 TEMPORARY PROTECTION R DIRECTION OF TRAFFIC LS 1.00 4,390.00 4,390.00 0.230960 1,013.91 0.230960 1,013.91
<br />11 40 FLAGGERS HOUR 200.00 34.00 6,800.00 16.00 544.00 - -
<br />12 50 EROSION CONTROL LS 1.00 2,090.00 2,090.00 0.230960 482.71 0.230960 482.71
<br />13 60 AGGREGATE CONSTRUCTION ENTRANCES EACH 7.00 940.00 6,580.00 2.00 1,880.00 2.00 1,880.00
<br />14 70 SILT FENCE, SUPPORTED M 1,273.50 16.00 20,376.00 180.00 2,880.00 180.00 2,880.00
<br />15 80 CONSTRUCTION/SILT FENCE, SUPPORED M 445.00 12.00 ~ 5,340.00
<br />16 90 PERMANENT SEEDING AND MULCHING LS 1.00 14,000.00 14,000.00 0.230960 3,233.44
<br />17
<br />18 ROADW ORK
<br />19
<br />20 100 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1.00 3,410.00 3,410.00 0.230960 787.57 0.230960 787.57
<br />21 110 CLEARING AND GRUBBING LS 1.00 2,640.00 2,640.00 0.230960 609.73 0.230960 609.73
<br />22 720 EMBANKMENT IN PLACE M3 8,796.00 20.00 135,960.00 800.00 16,000.00 800.00 16,000.00
<br />23 130 FINISHING ROADBED AND SLOPES M2 21,970.00 0.83 18,235.10 8,505.00 7,059.15 8,505.00 7,059.15
<br />24 140 SUBGRADEGEOTEXTILE M2 3,710.00 2.20 8,162.00 3,000.00 6,600.00 3,000.00 6,600.00
<br />25
<br />26 DRAINA GE AND SEWERS
<br />27
<br />28 150 200 mm STORM SEWER PIPE M 174.00 67.00 11,658.00
<br />29 160 250 mm STORM SEWER PIPE M 2.30 139.00 319.70
<br />30 170 300 mm STORM SEWER PIPE M 57.40 66.00 3,788.40 42.00 2,772.00 42.00 2,772.00
<br />31 180 450 mm STORM SEWER PIPE M 39.00 74.00 2,886.00 -
<br />32 190 600 mm STORM SEWER PIPE M 8.00 121.00 968.00
<br />33 200 900 mm STORM SEWER PIPE M 40.00 127.00 5,080.00 -
<br />34 210 250/900 TEE EACH 1.00 530.00 530.00
<br />35 220 CONCRETE INLET, TYPED EACH 1.00 1,250.00 1,250.00
<br />36 230 INSTALL HEAD GATE, COMPLETE EACH 4.00 213.00 852.00
<br />37 240 MANHOLE CUTIN, COMPLETE EACH 1.00 242.00 242.00
<br />38
<br />39 BRIDG ES
<br />40 BRIDGE#1 18993
<br />41
<br />42 250 STRUCTURE EXCAVATION LS 1.00 733.00 733.00
<br />43 260 GRANDULAR STRUCTURE BACKFILL LS 1.00 1,160.00 1,160.00 -
<br />44 270 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 -
<br />45 280 FURNISH PP324 X 9.53 STEEL PIPE PILES M 66.00 52.00 3,432.00 -
<br />46 290 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00
<br />47 300 REINFORCED PILE TIPS EACH 6.00 113.00 678.00
<br />48 310 PP324 X 9.5 STEEL PILE SPLICES EACH 1.00 189.00 189.00
<br />49 320 REINFORCEMENT LS 1.00 4,520.00 4,520.00 -
<br />50 330 COATED REINFORCEMENT LS 1.00 2,980.00 2,980.00 -
<br />51 340 _STRUCTURAL CONCRETE, CL9SS.25. __...___.__ ._.._..._ .._._.._... LS._..___ ._._._...1.00 _.._._...15,100.00_ _._ 15,100.00
<br />_.
<br />-
<br />-
<br />52 350 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,500.00 10,500.00
<br />53. ~SQ _P~S~375PRECASS~_BESS 09_ 48 ____-_.___. __. - _
<br />54 370 50 mm ELECTRICAL CONDUIT M 65.00 35.00 2,275.00 -
<br />55 380 PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 15,100.00 -
<br />56
<br />57 BRIDGE#2 18994 - ^'~ ~ _ ~'-"- T
<br />-
<br />- 58. _ _. _.. ---- --- -- ----- --- ---- ------- ----- - _-- _... ---- ---
<br />59 390 STRUCTURE EXCAVATION LS 1.00 733.00 733.00
<br />60 400 GRANULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00
<br />61 410 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00
<br />62 420 FURNISH PP324 X 9.5 STEEL PIPE PILES M 78.00 54.00 4,212.00
<br />
<br />64 440 REINFORCED PILE TIPS EACH 6.00 113.00 678.00
<br />65 450 PP324 X 9.5 STEEL PILE SPLICES EACH 6.00 189.00 1,134.00 - -
<br />66 460 REINFORCEMENT LS 1.00 4,290.00 4,290.00 -
<br />67 470 COATED REINFORCEMENT LS 1.00 2,680.00 2,680.00
<br />68 480 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,500.00 14,500.00
<br />69 490 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,200.00 10,200.00
<br />70 500 DBT 1375 PRECAST PRESTRESSED BEAMS M 59.00 713.00 42,067.00 -
<br />71 510 50mm ELECTRICAL CONDUIT M 55.00 39.00 2,145.00
<br />72 520 PEDESTRIAN BRIDGE RAIL LS 1.00 13,200.00 13,200.00 -
<br />73
<br />~74. ._.._. .-BRIDGEtt3.....18995 _..-._._.._..._....-------- -- - --......------ -------....- ------ -----__..__.._..-- ---'- - -- - ------- -- ----------
<br />~'1" ...-_ ., _ _.._... .,_.~;~ ,._dw,a,,.w .... ,..., .,. e..., ~.,,.,.~.. . .-~.. ~,...:~;..._, e ,.,..~ „ .,_ ~...~ .,~..., ... ,~,..., _..-. _ ~,u.,n...a, tea.. ..w-. _ ._ ,.,:,~.~, _
<br />76 530 STRUCTURE EXCAVATION LS 1.00 733.00 733.00
<br />77 540 GRANULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00
<br />78 550 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00
<br />79 560 FURNISH PP324 X 9.5 STEEL PIPE PILES M 55.00 48.00 2,640.00
<br />80 570 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00
<br />81 580 REINFORCED PILE TIPS EACH 6.00 113.00 678.00
<br />82 590 PP324 X 9.5 STEEL PILE SPLICES EACH 189.00
<br />-83 600 REINFORCEMENT LS 1.00 4,290.00 4,290.00 -
<br />84 610 COATED REIFORCEMENT LS 1.00 2,680.00 2,660.00 -
<br />85 620 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,500.00 14,500.00 -
<br />86 630 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,200.00 10,200.00
<br />87 640 DBT 1375 PRECAST PRESTRESSED BEAMS M 59.00 713.00 42,067.00 -
<br />88 650 50 mm ELECTRCAL CONDUIT M 55.00 39.00 2,145.00 -
<br />89 660 PEDESTRIAN BRIDGE RAIL LS 1.00 13,200.00 13,200.00
<br />90
<br />91 BRIDGE #4 18996
<br />92
<br />93 670 STRUCTURE EXCAVATION LS 1.00 733.00 733.00
<br />94 680 GRANDULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00
<br />95 690 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 -
<br />96 700 FURNISH PP324 X 9.5 STEEL PIPE PILES M 73.00 46.00 3,358.00 -
<br />97 710 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00 -
<br />98 720 REINFORCED PILE TIPS EACH 6.00 113.00 678.00
<br />99 730 PP325 X 9.5 STEEL PILE SPLICES EACH 189.00 -_- -'-
<br />100 740 REINFORCEMENT LS 1.00 4,400.00 4,400.00
<br />101 750 COATED REINFORCEMENT LS 1.00 2,890.00 2,890.00 -
<br />102 760 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,600.00 14,600.00 -
<br />103 770 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,600.00 10,600.00
<br />104 780 DBT 1375 PRECAST PRESTRESSED BEAMS M 71.00 680.00 48,280.00 -
<br />105 790 50 mm ELECTRICAL CONDUIT M 60.00 37.00 2,220.00 -
<br />106 800 PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 15,100.00 -
<br />107
<br />108 RETAIN ING WALL
<br />109
<br />110 810 BLOCK RETAINING WALL EACH 675.00 9.30 6,277.50 -
<br />111 co breakout 10.4-02