A B C D E F H 1 J K L <br />1 AS BID CORP BREAKOUT 10-4-02 .' <br />~ <br />2 TOTAL PROJECT AS-81D COE•REC/PATH ELIGIBLE WORK COMPLETE <br />3 AS OF 11-1-02 <br />4 NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />5 <br />6 MOBILI ZATION AND TRAFFIC CONTROL <br />7 <br />8 10 ON-THE-JOB TRAINING HOUR 500.00 1.00 500.00 <br />9 20 MOBILIZATION LS 1.00 85,822.00 85,822.00 0.234363 20,113.46 0.234363 20,113.46 <br />10 30 TEMPORARY PROTECTION R DIRECTION OF TRAFFIC LS 1.00 4,390.00 4,390.00 0.230960 1,013.91 0.230960 1,013.91 <br />11 40 FLAGGERS HOUR 200.00 34.00 6,800.00 16.00 544.00 - - <br />12 50 EROSION CONTROL LS 1.00 2,090.00 2,090.00 0.230960 482.71 0.230960 482.71 <br />13 60 AGGREGATE CONSTRUCTION ENTRANCES EACH 7.00 940.00 6,580.00 2.00 1,880.00 2.00 1,880.00 <br />14 70 SILT FENCE, SUPPORTED M 1,273.50 16.00 20,376.00 180.00 2,880.00 180.00 2,880.00 <br />15 80 CONSTRUCTION/SILT FENCE, SUPPORED M 445.00 12.00 ~ 5,340.00 <br />16 90 PERMANENT SEEDING AND MULCHING LS 1.00 14,000.00 14,000.00 0.230960 3,233.44 <br />17 <br />18 ROADW ORK <br />19 <br />20 100 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1.00 3,410.00 3,410.00 0.230960 787.57 0.230960 787.57 <br />21 110 CLEARING AND GRUBBING LS 1.00 2,640.00 2,640.00 0.230960 609.73 0.230960 609.73 <br />22 720 EMBANKMENT IN PLACE M3 8,796.00 20.00 135,960.00 800.00 16,000.00 800.00 16,000.00 <br />23 130 FINISHING ROADBED AND SLOPES M2 21,970.00 0.83 18,235.10 8,505.00 7,059.15 8,505.00 7,059.15 <br />24 140 SUBGRADEGEOTEXTILE M2 3,710.00 2.20 8,162.00 3,000.00 6,600.00 3,000.00 6,600.00 <br />25 <br />26 DRAINA GE AND SEWERS <br />27 <br />28 150 200 mm STORM SEWER PIPE M 174.00 67.00 11,658.00 <br />29 160 250 mm STORM SEWER PIPE M 2.30 139.00 319.70 <br />30 170 300 mm STORM SEWER PIPE M 57.40 66.00 3,788.40 42.00 2,772.00 42.00 2,772.00 <br />31 180 450 mm STORM SEWER PIPE M 39.00 74.00 2,886.00 - <br />32 190 600 mm STORM SEWER PIPE M 8.00 121.00 968.00 <br />33 200 900 mm STORM SEWER PIPE M 40.00 127.00 5,080.00 - <br />34 210 250/900 TEE EACH 1.00 530.00 530.00 <br />35 220 CONCRETE INLET, TYPED EACH 1.00 1,250.00 1,250.00 <br />36 230 INSTALL HEAD GATE, COMPLETE EACH 4.00 213.00 852.00 <br />37 240 MANHOLE CUTIN, COMPLETE EACH 1.00 242.00 242.00 <br />38 <br />39 BRIDG ES <br />40 BRIDGE#1 18993 <br />41 <br />42 250 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br />43 260 GRANDULAR STRUCTURE BACKFILL LS 1.00 1,160.00 1,160.00 - <br />44 270 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 - <br />45 280 FURNISH PP324 X 9.53 STEEL PIPE PILES M 66.00 52.00 3,432.00 - <br />46 290 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00 <br />47 300 REINFORCED PILE TIPS EACH 6.00 113.00 678.00 <br />48 310 PP324 X 9.5 STEEL PILE SPLICES EACH 1.00 189.00 189.00 <br />49 320 REINFORCEMENT LS 1.00 4,520.00 4,520.00 - <br />50 330 COATED REINFORCEMENT LS 1.00 2,980.00 2,980.00 - <br />51 340 _STRUCTURAL CONCRETE, CL9SS.25. __...___.__ ._.._..._ .._._.._... LS._..___ ._._._...1.00 _.._._...15,100.00_ _._ 15,100.00 <br />_. <br />- <br />- <br />52 350 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,500.00 10,500.00 <br />53. ~SQ _P~S~375PRECASS~_BESS 09_ 48 ____-_.___. __. - _ <br />54 370 50 mm ELECTRICAL CONDUIT M 65.00 35.00 2,275.00 - <br />55 380 PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 15,100.00 - <br />56 <br />57 BRIDGE#2 18994 - ^'~ ~ _ ~'-"- T <br />- <br />- 58. _ _. _.. ---- --- -- ----- --- ---- ------- ----- - _-- _... ---- --- <br />59 390 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br />60 400 GRANULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00 <br />61 410 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 <br />62 420 FURNISH PP324 X 9.5 STEEL PIPE PILES M 78.00 54.00 4,212.00 <br /> <br />64 440 REINFORCED PILE TIPS EACH 6.00 113.00 678.00 <br />65 450 PP324 X 9.5 STEEL PILE SPLICES EACH 6.00 189.00 1,134.00 - - <br />66 460 REINFORCEMENT LS 1.00 4,290.00 4,290.00 - <br />67 470 COATED REINFORCEMENT LS 1.00 2,680.00 2,680.00 <br />68 480 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,500.00 14,500.00 <br />69 490 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,200.00 10,200.00 <br />70 500 DBT 1375 PRECAST PRESTRESSED BEAMS M 59.00 713.00 42,067.00 - <br />71 510 50mm ELECTRICAL CONDUIT M 55.00 39.00 2,145.00 <br />72 520 PEDESTRIAN BRIDGE RAIL LS 1.00 13,200.00 13,200.00 - <br />73 <br />~74. ._.._. .-BRIDGEtt3.....18995 _..-._._.._..._....-------- -- - --......------ -------....- ------ -----__..__.._..-- ---'- - -- - ------- -- ---------- <br />~'1" ...-_ ., _ _.._... .,_.~;~ ,._dw,a,,.w .... ,..., .,. e..., ~.,,.,.~.. . .-~.. ~,...:~;..._, e ,.,..~ „ .,_ ~...~ .,~..., ... ,~,..., _..-. _ ~,u.,n...a, tea.. ..w-. _ ._ ,.,:,~.~, _ <br />76 530 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br />77 540 GRANULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00 <br />78 550 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 <br />79 560 FURNISH PP324 X 9.5 STEEL PIPE PILES M 55.00 48.00 2,640.00 <br />80 570 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00 <br />81 580 REINFORCED PILE TIPS EACH 6.00 113.00 678.00 <br />82 590 PP324 X 9.5 STEEL PILE SPLICES EACH 189.00 <br />-83 600 REINFORCEMENT LS 1.00 4,290.00 4,290.00 - <br />84 610 COATED REIFORCEMENT LS 1.00 2,680.00 2,660.00 - <br />85 620 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,500.00 14,500.00 - <br />86 630 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,200.00 10,200.00 <br />87 640 DBT 1375 PRECAST PRESTRESSED BEAMS M 59.00 713.00 42,067.00 - <br />88 650 50 mm ELECTRCAL CONDUIT M 55.00 39.00 2,145.00 - <br />89 660 PEDESTRIAN BRIDGE RAIL LS 1.00 13,200.00 13,200.00 <br />90 <br />91 BRIDGE #4 18996 <br />92 <br />93 670 STRUCTURE EXCAVATION LS 1.00 733.00 733.00 <br />94 680 GRANDULAR STRUCTURE BACKFILL LS 1.00 945.00 945.00 <br />95 690 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2,120.00 2,120.00 - <br />96 700 FURNISH PP324 X 9.5 STEEL PIPE PILES M 73.00 46.00 3,358.00 - <br />97 710 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 3,180.00 - <br />98 720 REINFORCED PILE TIPS EACH 6.00 113.00 678.00 <br />99 730 PP325 X 9.5 STEEL PILE SPLICES EACH 189.00 -_- -'- <br />100 740 REINFORCEMENT LS 1.00 4,400.00 4,400.00 <br />101 750 COATED REINFORCEMENT LS 1.00 2,890.00 2,890.00 - <br />102 760 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,600.00 14,600.00 - <br />103 770 STRUCTURAL CONCRETE, CLASS 30 LS 1.00 10,600.00 10,600.00 <br />104 780 DBT 1375 PRECAST PRESTRESSED BEAMS M 71.00 680.00 48,280.00 - <br />105 790 50 mm ELECTRICAL CONDUIT M 60.00 37.00 2,220.00 - <br />106 800 PEDESTRIAN BRIDGE RAIL LS 1.00 15,100.00 15,100.00 - <br />107 <br />108 RETAIN ING WALL <br />109 <br />110 810 BLOCK RETAINING WALL EACH 675.00 9.30 6,277.50 - <br />111 co breakout 10.4-02 <br />