' A - 'B C D E F H I J K L <br /> <br />" ^L <br />' 2 AS BID CORP BREAKOUT 10.402 <br />TOTAL PROJECT AS-BID <br />COE-RECIPAT <br />H ELIGIBLE <br />WORK COMPLETE <br />' 3 <br />4 NO. <br />ITEM UNIT <br />QUANTITY OR FlNAL QU <br />UNIT PRICE ANTITIES <br />AMOUNT <br />QUANTITY <br />AMOUNT AS OF 11-1-0 <br />QUANTITY <br />AMOUNT <br /> 5 <br /> 6 MOBILI ZATION AND TRAFFIC CONTROL <br /> 7 <br />'. 8 10 ON-THEJOB TRAINING HOUR 500.00 1.00 500.00 - <br /> 9 20 <br />10 30 MOBILIZATION LS <br />TEMPORARY PROTECTION & DIRECTION OF TRAFFC LS 1.00 <br />1.00 85822.00 <br />4,390.00 85822.00 <br />4,390.00 0.233803 <br />0.230960 20,065.42 <br />1 013.91 0.233803 <br />0.230960 20065.42 <br />1,013.91 <br /> 11 40 FLAGGERS HOUR 396.50 34.00 13481.00 90.00 3060.00 90.000000 3,060.00 <br />'~, 12 50 EROSION CONTROL LS 1.00 2,090.00 2090.00 0.230960 482.71 0.230960 482.71 <br /> 13 60 AGGREGATE CONSTRUCTION ENTRANCES EACH 7.00 940.00 8,580.00 2,00 1,880,00 2.00 1880.00 <br /> 14 70 SILT FENCE, SUPPORTED M 1273.50 16.00 20,378.OD 250.00 4000.00 250.00 4000.00 <br /> 15 80 CONSTRUCTIOWSILT FENCE, SUPPORED M 445.00 12.00 5,340.00 <br /> 18 90 PERMANENT SEEDING AND MULCHING LS 1.00 74000.00 14000.00 0.230960 3233.44 0.230960 3233.44 <br /> 17 - <br />'~ 18 ROADW ORK <br /> <br />~ 19 <br />''~, <br />' 20 100 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS 1.00 3 410.00 3,410.00 0.230960 787:'7 0.230960 787.57 <br />' <br />' 21 170 CLEARING AND GRUBBING LS 1.00 2,640.00 2,640.00 0.230980 809.73 0.230960 609.73 <br />, 22 120 <br />23 130 EMBANKMENT IN PLACE M3 <br />FlNISHINGROADBEDANDSLOPES M2 6460.00 <br />23553.00 20.00 <br />0.83 129600.00 <br />19548.99 800.00 <br />8,505.00 16 <br />7 :15- 800.00 <br />6,505.00 18000.00 <br />7059.15 <br /> 24 140 SUBGRADE GEOTEXTILE M2 1734.00 2.20 3 814.80 1,734.00 ~ 3 814.80 1734.00 3 814.80 <br /> 25 <br /> 28 DRAINA GE AND SEWERS <br /> 27 <br /> 28 150 200 mm STORM SEWER PIPE M 207.00 67.00 13,889.00 <br /> 29 160 250 mm STORM SEWER PIPE M 2.30 139.00 319.70 <br /> 30 170 300 mm STORM SEWER PIPE M 57.40 68.00 3788.40 42.00 2,772.00 42.00 772.00 <br /> 31 180 450 mm STORM SEWER PIPE M <br />32 190 600 mm STORM SEWER PIPE M 53.50 <br />8.50 74.00 <br />121.00 3,959.00 <br />1,028.50 <br /> 33 200 900 mm STORM SEWER PIPE M 40.00 127.00 5080.00 <br /> 34 210 250/900 TEE EACH <br />35 220 CONCRETE INLET, TYPED EACH - 1.00 <br />1,00 530.00 <br />1 250.00 530.00 <br />1 250.00 <br /> 38 230 INSTALL HEAD GATE, COMPLETE EACH 4.00 213.00 852.00 <br /> 37 240 MANHOLE CUTIN, COMPLETE EACH 1.00 242.00 242.00 <br /> 38 <br /> 39 BRIDGES <br /> 40 BRIDGE#1 18993 <br /> 41 <br /> 42 250 STRUCTURE IXCAVATION LS 1.00 733.00 733.00 <br /> 43 260 GRANDULAR STRUCTURE BACKFlLL LS ~ 1,00 1 160.00 1 180.00 <br /> 44 270 FURNISH PILE DRIVING EQUIPMENT LS 1.00 2120.00 2120.00 <br /> 45 280 FURNISH PP324 X 9.53 STEEL PIPE PILES M 88.00 52.00 3432.00 <br /> 48 290 DRNE PP324 X 9.5 STEEL PIPE PILES EACH 6.00 530.00 180.00 <br /> 47 300 REINFORCED PILE TIPS EACH ~ 8.00 113.00 878.00 <br /> 48 310 PP324 X 9.5 STEEL PILE SPLICES EACH 1.00 189.00 189.00 <br /> 49 320 REINFORCEMENT LS <br />50 330 COATED REINFORCEMENT LS <br />-51 -340 STRUCTURALCONCRET CLASS 25 LS 1.00 <br />1.00 <br />1.00 4520.00 <br />2980.00 <br />15100.00 4.520.00 <br />980.00 <br />- 95100.00 <br />_______. <br />__._.._-_ <br />- <br />_.--._.._.._ <br />-..._ <br />- <br />-.. <br /> <br />-- 52 _ 350 _STRUCTURAL CONCRET CLASS 30 LS 1.00 ' .10500.00 .,9g _ - - <br /> 380 bBT 1375 PRECAST PRESTRESSED BEAMS M <br />54 370 50 mm ELECTRICAL CONDUR M 71.00 <br />65.00 660.00 <br />35.00 48 80.00 <br />2 275.00 _ _ <br /> 55 380 PEDESTRIAN BRIDGE RAIL LS 1.00 15100.00 15100.00 <br /> <br />- -57 BRIDGE #2 18994 ------ - -- --- --- ---- <br /> 58 <br /> 59 390 STRUCTUREIXCAVATION LS 1.00 733.00 733.00 <br /> 60 400 GRANULAR STRUCTURE BACKFlLL LS 1.00 945.00 945.00 - - - <br /> 6 .410 FURNISH PILE DRMNG EQUIPMENT LS 1.00 <br />. 2120.00 2120.00 <br />.... <br /> <br />--= 83 430 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH <br />.64- -440_REINFORCEDPILETIPS...._ ------- -.- -... "..- EACH.-. 6.00 <br />. ........8.00 530.00 <br />-.'°-113.00 3.180.00 <br />_. -678:00 - <br />-_.. <br />-.-. - <br />_.- -..... <br /> 65 450 PP324 X 9.5 STEEL PILE SPLICES EACH 8.00 189.00 1 134.00 <br /> 88 480 REINFORCEMENT LS 1.00 4,290.00 4 .00 <br /> 67 470 COATED REINFORCEMENT LS 1.00 2,680.00 2680.00 <br /> 68 480 STRUCTURAL CONCRET CLASS 25 LS <br />fis aso srRUCruRALCONCRET cuss 3o Ls 1.00 <br />too 14500.00 <br />10200.00 14500.00 <br />lozoo.oo <br /> 70 500 DBT 1375 PRECAST PRESTRESSED BEAMS M <br />71 510 50mm ELECTRICAL CONDUIT M <br />72 520 PEDESTRIAN BRIDGE RAIL LS 59.00 <br />55.00 <br />1.00 713.00 <br />39.00 <br />13200.00 42087.00 <br />2,145.00 <br />13200.00 <br />.'. -73 ........... - -- ---- ----- - ----- ----- <br />... _._ - .._ <br />. __. -_.. ..-.. -.-... ...._ ..... _. _._ .-._. .. <br /> 75 <br /> 78 530 STRUCTURE EXCAVATION LS <br />77 540 GRANULAR STRUCTURE BACKFILL LS 1.00 <br />1.00 733.00 <br />945.00 733.00 <br />945.00 <br /> 78 550 FURNISH PILE DRIVING EQUIPMENT LS <br />79 580 FURNISH PP324 X 9.5 STEEL PIPE PILES M 1.00 <br />55.00 2120.00 <br />48.00 2120.00 <br />2840.00 <br /> 80 570 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH <br />81 580 REINFORCED PILE TIPS EACH 8.00 <br />8.00 530.00 <br />113.00 3180.00 <br />678.00 <br /> 82 590 PP324 X 9.5 STEEL PILE SPLICES EACH <br />83 600 REINFORCEMENT LS <br />1.00 189.00 <br />4290.00 <br />4290.00 <br /> 84 810 COATEDREIFORCEMENT LS - 1.00 2680.00 2880.00 <br /> 85 620 STRUCTURAL CONCR CLASS 25 LS 1.00 14500.00 14,500.00 <br /> 88 630 STRUCTURAL CONCRET CLASS 30 LS 1.00 10200.00 10 200.00 <br /> 87 840 DBT 1375 PRECAST PRESTRESSED BEAMS M <br />88 650 50 mm ELECTRCAL CONDUIT M 59.00 <br />55.00 713.00 <br />39.00 42067.00 <br />2,145.00 <br /> 89 660 PEDESTRIAN BRIDGE RAIL LS 1.00 13 200.00 13 00.00 <br />- <br /> ~ - <br /> 91 BRIDGE #4 18996 <br /> 92 <br /> 93 870 STRUCTURE IXCAVATION LS 1.00 733.00 733.00 <br /> 94 680 GRANDULAR STRUCTURE BACKFILL LS <br />95 890 FURNISH PILE DRIVING EQUIPMENT LS 1.00 <br />1.00 945.00 <br />2,120.00 945.00 <br />2120.00 <br /> 96 700 FURNISH PP324 X 9.5 STEEL PIPE PILES M 73.00 46.00 3358.00 <br /> 97 710 DRIVE PP324 X 9.5 STEEL PIPE PILES EACH <br />98 720 REINFORCED PILE TIPS EACH 8.00 <br />6.00 530.00 <br />113.00 3,180.00 <br />878.00 <br /> 99 730 PP325 X 9.5 STEEL PILE SPUCES EACH 189.00 <br />1 00 740 REINFORCEMENT LS 1.00 4400.00 4,400.00 <br />1 01 750 COATED REINFORCEMENT LS 1.00 2 890.00 2 890.00 <br />1 02 760 STRUCTURAL CONCRETE, CLASS 25 LS 1.00 14,600.00 14,600.00 <br />1 03 770 STRUCTURAL CONCRET CLASS 30 LS 1.00 10600.00 10600.00 <br />1 04 780 DBT 1375 PRECAST PRESTRESSED BEAMS M 71.00 680.00 48 280.00 <br />1 790 50 mm ELECTRICAL CONDUIT M 60.00 37.00 2,220.00 <br />' 1 06 800 PEDESTRL4N BRIDGE RAIL LS 1.00 15,100.00 15,100.00 <br />1 07 <br />1 08 RETAINING WALL <br />1 09 <br />1 10 810 BLOCK RETAINING WALL EACH 675.00 9.30 6,277.50 <br />1 11 w breakout 1-1303 <br />