New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4013 Revenue Folder BLM HAF031M01
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4013 Revenue Folder BLM HAF031M01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 1:40:58 PM
Creation date
12/30/2008 1:34:59 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004013
GL_Project_Number
925020
COE_Contract_Number
2004-05404
GL_Grant
310
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.0 DEFINITIONS <br /> None. <br /> 3.0 COOPERATOR FURNISHED ITEMS <br /> All materials, supplies, a-~d equipment needed to complete this work will be <br /> provided by the. Cooperator. <br /> 4.0 GOVERNMENT-FURNISHED ITEMS <br /> The BLM will provide all ESA Section 7 Consultation and any needed NEPA <br /> documentation. <br /> 5.0 SPECIFIC TASKS <br /> . The' purpose of this task order is to. provide funding for the CITY to implement <br /> habitat restoration activities on the TNC's ortion of the Willow Corner site, as <br /> P <br /> . detailed in the Willow Corner. Mitigation Improvement Plan. The specific tasks <br /> include: <br /> A. Engineering and Design. This will be conducted by .City staff: -This task will <br /> include costs such as pre-construction surveys, ss well as production of <br /> construction documents and bid specifications. <br /> B. The clearing of existing vegetation that is growing on .the fill material. This <br /> <br /> - work will be performed by a contractor hired by the City using a competitive <br /> bid process. The work. will be inspected on-site by City staff. <br /> C. The removal of <br /> fill material <br /> from the site. This work will be performed by a <br /> . contractor hired by the City using a competitive bid process. Thy work will <br /> be inspected on-site by City staff: <br /> D. Final grading of the site to prepare it for re-seeding with native species. This <br /> work will be performed by a contractor hired by the City using a competitive <br /> bid process. The work will be inspected on-site by City staff. <br /> E. Collection of native seed <br /> for distribution on the site. This work will be <br /> conducted by City staff. <br /> F. Planting the seed. 'This work will be conducted by City staff. <br /> G. Post construction survey. This work will be conducted by City staff. <br /> 6.0 PERFORMANCE SCHEDULE <br /> The majority of this work will .occur between July 21-November 15, 2003. <br /> _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.