New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EWEB PPP Projects Revenue Folder
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
EWEB PPP Projects Revenue Folder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2009 2:24:24 PM
Creation date
12/30/2008 12:39:06 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
Identification_Number
EWEB - PPP Projects
COE_Contract_Number
2005-00213
GL_Grant
990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02668 <br /> Specification for Adjustment of EWEB Water Distribution Facilities <br /> Page 1 of 1 <br /> 1.0 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Water Valve Boxes <br /> B. Valve Box Risers <br /> 1.02 REFERENCES <br /> A. EWEB Standard WC5-3.1000 -Typical Valve Box Installation <br /> 1.02.1 The contractor shall make all arrangements with EWEB Water Distribution to obtain. all <br /> materials to complete the work. <br /> <br /> 2.0 PRODUCTS <br /> A. Valve Boxes -EWEB will supply to the contractor all valve boxes and lids <br /> necessary to complete the work <br /> B. Valve Box Risers -EWEB will supply to the contractor all valve box risers <br /> necessary to complete the work. <br /> <br /> 3.0 EXECUTION <br /> A. The contractor will pick up materials at EWEB's Operations yard, 500 E. 4th Ave. <br /> Eugene, Oregon, as needed. <br /> B. Install and or adjust EW EB valve boxes, risers and lids in a manner consistentwith <br /> the use of EWEB water valve, as shown in EWEB Standard WC5-3.1000 and to <br /> the satisfaction of EWEB. <br /> 1. Center box over the operator nut on the watervalve <br /> 2. Remove debris from the valve the to allow unobstructed access to and <br /> operation of the operator nut on the valve. <br /> 3. Set top of valve box or riser flush with the street surface. <br /> C. Report any leakage from any water valve to EWEB at 484-3766, as soon as <br /> possible. <br /> D. Markin blue paint the exact location of any valve that is temporarily covered in the <br /> course of the project: The mark shall be a blue "V" inside a 12-inch diametercircle <br /> at the location of the valve that was covered. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.