<br /> ~ K <br /> Franklin @ Alder Pedestrian Crossing, Eugene <br /> pA <br /> ~ ~ <br /> ~ ~ zt <br /> A • ~ ~ <br /> I ~ <br /> I <br /> i <br /> ' ~:~1 <br /> ,V <br /> ~x <br /> ~ ~ ~ <br /> c, <br /> 1. Construct pedestrian refuge island 12' wide with 10' cut-through; ladder bar crossing. <br /> 2. Rebuild corner to realign new access ramps. <br /> 3. Construct new access ramp for Alder crossing. <br /> 4. Install advance stop bars at appropriate locations. <br /> 5. Remove drive, extend setback sidewalk and curb and gutter from east. <br /> 6. Install new access ramp. <br /> . 7. Install standard driveway, widen existing 3-112' wide curbside sidewalk by 4 - 5' for 150'. <br /> 8. Install 200' curb and gutter, and setback or curbside sidewalk 6-7' wide as <br /> right-of-way allows. <br /> <br />