Change Order Justification <br /> CONTRACTOR: Wildish Construction Co. Job # 3502 <br /> P.O. Box 7428 Contract # 200420 <br /> Eugene, OR 97401 Change Order # ~ <br /> PROJECT: Garden Wav Improvements <br /> <br /> i <br /> . Reason for Change Order: <br /> <br /> ~I Contract <br /> tram <br /> No. <br /> 1060 -1140 ODOT a roached Ci en ineedn staff Burin construction of this ro'ectaM informed us of an u cumin I-105 avin ro'ect in <br /> which their tans called for truckin loaded haul vehicles across Garden Wa between sta. 39+00 and 43+50. The Ci and ODOT worked out <br /> the details to address loaded trucks on this section of Garden Wa and asked Wildish for and esflmate to ertorm the work. The items in this <br /> than a order are all due to these cha es. <br /> 1060 Increased the de th of drivewa to from 6" fo 8" on three drivewa between stations 39+00 - 43+50 <br /> 1070 Su I #4 rebar for three ddvewa between station 39+00 - 43+50 -120' total, 20 foot sticks <br /> 1080 Place misc. blocks, ties and v4re for relnforcin ddvewa between stations 39+00 - 43+50. <br /> 1090 Three masons at 8 hours each to tie and set rebar in ddvewa between station 39+00 - 43+50 <br /> 1100 Increase utter bar de th from standard 7" to 9" in de th between curb cuts each drivewa between station 39+00 - 43+50. <br /> 1110 Mason cha a -four mason hours to lace and flnish extra PCC <br /> 1120 Additional drivewa excavation of 7.5 cubic rds <br /> 1130 Reduced 12" rock to 10' of rods to ain eMra 2" of base course AC -Extra AC between station 39+00 - 43+50 <br /> 1140 Rock shucture was alread rou had in and had to be raded doH~n. <br /> <br />