New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3502 Revenue Folder
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3502 Revenue Folder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:55:32 PM
Creation date
12/30/2008 9:34:52 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
No
External_View
No
GJN
003502
GL_Project_Number
985014
Identification_Number
Key #10349
COE_Contract_Number
2003-00309
Retention_Destruction_Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OFfUGENE - <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # 3502 <br /> Contract # 2004-20 <br /> CONTRACTOR: WILDISH CONSTRUCTION CO. ~ Change Order # 1 <br /> ' (ADDRESS) P O BOX 7428 Date: 07/20/04 <br /> C;.; Eugene, OR 97401-0428 CAMS Date: <br /> Reviewed b . Date: <br /> PROJECT: Paving, curbs, gutters, sidewalks, median, street lichts traffic signal Inspector: John Bonham <br /> street trees, wastewater, and storm water drainage on Gallen Way from Paige Dickinson <br /> Sisters View Ave. to Martin Luther King Jr. Blvd. north side of Martin Luther Proj. Mgr. Steve Galiu <br /> <br /> j Kmg Jr. Blvd. from Marche Chase Ddve to I-5 Prindpal Eng. Paut Klo e <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> kem <br /> No. <br /> 1060 Increase the de th of ddvewa to 8" on three drivewa be een stations 39+00 - 43+50 <br /> 1070 Reinforce three drivewa between station 39+00 - 43+50 with #4 rebar <br /> 1080 Install miscellaneous blocks ties and wire for reinfordn drivewa between sta8ons 39+00.43+50. <br /> 1090 Tie and set mbar in drivewa between station 39+00 - 43+50 <br /> 1100 Increase utter bar de th from standard 7" to 9" in de th between curb cuts each ddvewa between station 39+00.43+50. <br /> 1110 Place and finish extra PCC <br /> 1120 7.5 cubic ros of drivewa excavation same three drivewa a <br /> 1130 Extra AC between station 39+00 - 43+50 <br /> 1140 EMra radio for vaned a 2 ate sWcture <br /> This changes the bid items as follows: <br /> Contract Contract <br /> item Time Quantlty Unit Amended Net <br /> No. Item Change (Units) Cost Amount Change Change <br /> Ori final 0.00 ( 0.00 0.00 50.00 <br /> Revised 0.001 0.00 0.00 <br /> 1060 Increase Ddvewa to 8" Depth 0 Amended 3.50 ICY $70.00 $245.00 $245.00 <br /> Od final 0.00 ' .OD 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 1070 #4 Rebar - 20' Sticks 0 Amended 120.00 ;Farb $6.00 $720.00 $720.00 <br /> Od final 0.00 .00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> 1080 Supply misc. blocks & tie wire for ReinPo ent 0 Amended 1.00 ; LS $100.00 $100.00 $100.00 <br /> _ Ori final 0.00 I 0.00 O.OD g0.00 <br /> Revised 0.00 % 0.00 0.00 <br /> 1090 Set blocks 8c Tie Rebar 0 Amended 24.00 IHR $55.00 $1320.00 $1,320.00 <br /> Ori foal 0.00 ! 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 1100 Increase Gutter Dar Depth to 9" 0 Amended 1.00 ,CY ;70.08 $70.00 $70.00 <br /> Ori final 0.00 0.00 0.00 80.00 <br /> Revised 0.00 0.00 0.00 <br /> 1110 Place Extra PCC 0 Amended 4.00 HR $55.00 $220.00 $220.00 <br /> Ori final 0.00 0:00 0.00 $0.00 <br /> Revised 0.00 t .00 0.00 <br /> 1120 7.5 CY of driveway excavation 0 Amended 7.50 ,CY $20.00 $150.00 $150.00 <br /> Orl anal 0.00 0.00 0.00 g0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 1130 Fxtra AC (additlonal 2") D Amended 168.60 $46.00 $7,755.60 $7,755.60 <br /> Ori Inal 0.00 0.00 0.00 50,00 <br /> Revised 0.00 ' 0.00 0.00 <br /> 1140 Extra grading for varied aggregate structure 0 Amended 1.00 IlS $1,250.00 $1,250.00 $1,250.00 <br /> Ori Inai 0.00 ~ 0.00 0.00 $0.00 <br /> Revised 0.00 ; 0.00 0.00 <br /> 0 Amended 0.00 $0.00 $0.00 $0.00 <br /> The original contract work days are o.o da <br /> The contract time change this C.O o.o da <br /> The contract time change by previous C.O.'s 0.0 da <br /> The new contract work da s are 0:0 da <br /> The original contract sum was 32,079,450.75 <br /> Net change by previous change order 30.00 <br /> Net change due to amendment by previous change order ' <br /> 30.00 <br /> The contract sum pliorto this change orderwas 32,079,a5o.75 <br /> This change order will change wntract sum by this amount 311,83o.so <br /> The new contract net change sum _ So 00 <br /> The new contract amendment sum 311,a3o.so <br /> The new contract sum including this change orderw(il be 32,091,281.35 <br /> Percents a of on final contract o.57i> <br /> NET CHANGE DUE TO AMENDMENTS 0.57% <br /> APP val by: <br /> Crty Engineer Prime tractor Third Party <br /> Date Dat Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASINGlCRO <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.