New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY05 SB1
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY05 SB1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:55:12 PM
Creation date
12/29/2008 3:50:14 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2005
PW_Division
Administration
Identification_Number
SB1FY05
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 1.3 Work Hours <br /> If specific work hours or start/stop times are required for a project, they will be specified <br /> within the contract for the work. <br /> 1.4 Site Security <br /> The CITY and its contractors may leave their equipment at the work site. However, the <br /> Government will not be responsible for the CITY's equipment or the CITY's contractor's <br /> equipment if it should become lost, stolen, or damaged. <br /> 1.5 Fire Precautions <br /> All state fire laws will be followed. <br /> i <br /> <br /> j Specific requirements for fire equipment may vary by local fire district. The CITY is <br /> required to check with local fire districts and furnish any equipment required by those <br /> districts. <br /> 2.0 DEFINITIONS <br /> None. <br /> 3.0 COOPERATOR FURNISHED ITEMS <br /> All materials su lies and a ui ment needed to com lete this work will be rovided b <br /> pp ~ q P p P Y <br /> the Cooperator. <br /> 4.0 GOVERNMENT-FURNISHED ITEMS <br /> None. <br /> 5.0 SPECIFIC TASKS <br /> The purpose of this task order is to provide funding for restoring riparian, wetland, and <br /> upland habitat types at the Delta Ponds. The specific tasks include: <br /> A. Engineering and design. This will be conducted by City staff and/or by consultants <br /> hired by the CITY. This task may include costs. such as pre-construction surveys, as <br /> well as production of construction documents and bid specifications. <br /> B. Contract and project management, including advertisement, administration, and bid <br /> preparation ofproject. This work will be performed by CITY staff. <br /> C. The clearing of existing, mostly non-native, vegetation that is growing along the pond <br /> banks and in the riparian zone. This work will be performed by a contractor hired by <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.