New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY04 SB1
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY04 SB1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:54:56 PM
Creation date
12/29/2008 3:34:39 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2004
PW_Division
Administration
Identification_Number
SB1FY04
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.0 DEFINITIONS . <br /> None. <br /> 3.0 COOPERATOR FURNISHED ITEMS <br /> All materials, supplies, and equipment needed to complete this work will be <br /> provided by the Cooperator. <br /> ~ _rt _ _ . <br /> <br /> j 4.0 GOVERNMENT <br /> F'UI2NISHED ITEMS <br /> i . <br /> The BLM will provide all ESA Section 7 Consultation and any needed NEPA <br /> <br /> i <br /> ' - documentation. <br /> <br /> ' S.0 SPECIFIC TASKS ~ - <br /> - The'purpose of this task order is to. provide funding for the CITY to implement <br /> habitat restoration~activities on the TNC's portion of the Willow corner site, as <br /> detailed in the Willow Corner Mitigation Improvement Plan. The specific tasks <br /> include: - <br /> A. Engineering. and Design. This will be conducted by .City staff..This task will <br /> include costs such aspre-construction surveys, as well as production of <br /> - - construction documents and bid specifications. <br /> - ~ B. The clearing of <br /> existing vegetation that is growing on .the -fill material. This <br /> - work will be performed by a contractor hired by the City using a competitive <br /> ~ bid process. The work. will be inspected on-site by City staff. . ~ . <br /> . ~ ~ ~ C. The removal of <br /> fill material <br /> from the site. This work will be performed by a _ <br /> contractor hired by, the City using a competitive bid process. Thy work will <br /> be inspected on-site by City staff. <br /> - ~ ~ D. Final grading of the site to prepare it <br /> for re <br /> seeding with native species. This <br /> work will be performed by a contractor hired by.the City using a competitive <br /> bid process. The work will be inspected on-site by City staff. <br /> . ~ ~ E. Collection of <br /> native seed <br /> for distribution on the site. This work will be <br /> conducted by City staff. _ ~ - <br /> F. Planting the seed. This work will be conducted by City staff. <br /> - G. Post construction survey. This work will tie conducted by City staff. - <br /> 6.0 PERFORMANCE SCHEDULE <br /> The majority of this work will .occur between July 21-November 15, 2003. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.