New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY04 SB1
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2008
>
FY04 SB1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:54:56 PM
Creation date
12/29/2008 3:34:39 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2004
PW_Division
Administration
Identification_Number
SB1FY04
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J AGREEMENT NUMBER: HAA031M00 <br /> STATEMENT OF WOR.T~ <br /> TASK ORDER HAF031M01 <br /> 1.0 .DESCRIPTION OF WORK <br /> The City of Eugene (CITY) will implement restoration on a small portion '(6.5 <br /> ~ ~ ~ acres) of The~Tature Conservancy's (TNC) Willow Creek Natural Area as <br /> detailed in the Willow Comer Mitigation Improvement Plan. The Willow Corner <br /> project involves land owned by both TNC and the CITY, which aze partners with <br /> the BLM in the West Eugene Wetlands Program. This Task Order will cover <br /> work on the TNC's portion of the site only. The work will involve: (a) the <br /> - ~ removal of fill material from the site, (b) the clearing of existing vegetation that is <br /> growing on the fill material, (c) final grading of the site to prepare it for re- ~ ~ - <br /> seeding~with native species, (d) collection ofnative seed for distribution on the <br /> site, and (e) planting the~seed. The majority of this work will be conducted by a <br /> contractor hired by the CITY: <br /> . 1.1 ~ AccesslLocation <br /> <br /> t ~ ~ <br /> The Willow Corner site is located at the corner of 18a' Street and Bertelsen _ <br /> - ~ .Avenue in Eugene, Oregon. The CITY owns 6.1 acres of the site, and the <br /> _ ~ 'remaining 6.5 acres is owned by TNC. The site is accessible by paved roads, but <br /> access within the sites will be limited to temporary access paths approved by the <br /> TNC and CITY. <br /> ' ~ 1.2 ~ ~ Work Hours <br /> If specific work hours or start/stop times are required. for a project, they will be <br /> specified via the work'request and/or during the pre-work meeting.-;.,. <br /> 1.3 ~ Site Security ' . ~ ~ . <br /> . ~ . ~ ~ ~ The CITY and its contractor may leave their equipment at the work site. <br /> . However, the Government will not be responsible for the CTTY's equipment or <br /> the CTTY's contractor's equipment if it should become lost, stolen, or damaged. <br /> 1'.4 )dire Precautions <br /> 1.4.1 All state fire laws will lie followed. <br /> ' Specific requirements for~fire equipment may vary by local fire district. The <br /> . CITY is required to check with local fire districts and fiunish any equipment <br /> - required by those districts. <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.