New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3984 OBEC CO#1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3984 OBEC CO#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 4:31:55 PM
Creation date
12/9/2008 12:14:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003984
GL_Project_Number
925096
COE_Contract_Number
2008-00234
Retention_Destruction_Date
7/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' City of Eugene Contract #2008-00234 <br /> Amendment One -Exhibit A <br /> <br /> ` 2. WORK ORDER TASKS: - Page -2 Of 3 <br /> Task 1 - Protect Coordination -and Meetings <br /> No additional coordination is anticipated. <br /> Task 2 -Structure Engineerina and InsneNion <br /> ConsultanT shall perform additional structure engineering and inspection as required to ensure <br /> conformance of the water quality vault structure construction with the approved plans and <br /> specifications for the Project. The following activities are involved in Structure Engineering and <br /> Inspection: <br /> ¦ Inspect temporary shoring construction and foundation excavations as required. <br /> • Inspect forming aril falsework for concrete construction. <br /> ¦ Inspect placement of materials including reinforcement, drilled dowels, slide gates, and weirs. <br /> Deliverables <br /> ¦ Document all engineering and inspection services using approved forms and report formats. <br /> ¦ Schedule: Submft topies of inspection reports weekly and originals with final documentation. <br /> Task 3 -Review Shop Drawings and Submittals <br /> No additional shop drawing review is anticipated. <br /> Task 4 -General Documentation <br /> No additional general documentation is anticipated. <br /> Task 5 -Change Order Assistance <br /> No additional Change Order assistance is anticipated. <br /> Task b - As-Constructed Plans <br /> No additional as-constructed plans are anticipated. <br /> Task 7 -Final Documentation <br /> No additional final documentation is anticipated <br /> Polk Street WO Vault - CE Services, Amendment No. 1 October 29, 2008 <br /> Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.