11 1 1 1 <br /> ~ ~ 11 1 ~ 1 ~ 1 <br /> Project Objectives Est. Cost Est. Start of <br /> (millions) Construction <br /> US 395: Curve Corrections Improve freight $2.6 2012 <br /> Correct curves on US 395 a t mile mobility <br /> <br /> points 31 and 38. Enhance safety <br /> NW Washington Ave (Ontario) Reduce traffic $4.5 2009 <br /> Realignment congestion <br /> Re-align to remove curve. Improve freight <br /> mobility <br /> Enhance safety <br /> Izee-Paulina Highway Improve freight $4.5 2012 <br /> Rebuild about 10 miles of county mobility <br /> road that serves as alternative to US Enhance safety <br /> 26 during closures. <br /> 64 <br /> <br />