New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
State Transportation Gov Report
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2009
>
State Transportation Gov Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:53:16 PM
Creation date
11/10/2008 2:13:03 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2009
GL_Fund
131
GL_ORG
8990
Identification_Number
State Tran Rpt 11/08
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 1 1 1 <br /> ~ ~ 11 1 ~ I ~ 1 <br /> Project Objectives Est. Cost Est. Start of <br /> (millions) Construction <br /> Pierce Road Improvements Reduce traffic $5.0 2010 <br /> (Union County) congestion <br /> Widen and pave county road for Improve freight <br /> more direct truck access to I -84 mobility <br /> from OR 82. Enhance safety <br /> Wallowa Truck Route Reduce traffic $1.8 2010 <br /> Improvements congestion <br /> Widen Spruce and Alder streets (OR Improve freight <br /> 82 to Truck Route), build 5 foot mobility <br /> bike/ped pathway and repair side- Enhance safety <br /> walks on OR 82 (Main Street). <br /> I-84: Snow Zone Speed Signing Enhance safety $1.09 2010 <br /> Install message signs indicating <br /> speed at strategic locations on I-84. <br /> Chandler Lane Reconstruction Reduce traffic $1.0 2010 <br /> (Baker) congestion <br /> Rebuild Chandler Lane between I-84 Improve freight <br /> and US 30 to provide alternate truck mobility <br /> route. <br /> Umatilla Port of Entry Circulation Improve freight $4.72 2012 <br /> Improvements mobility <br /> Improve traffic flow/ reduce back- Enhance safety <br /> ups on I-82 ramps for trucks pass- <br /> ing through Port of Entry. <br /> I-84: Chain Up Enhancements Enhance safety $4.72 2012 <br /> Build safety pull out/ chain-up ar- <br /> eas atstrategic locations on I-84. <br /> OR 82: Minam Grade, Phase II Reduce traffic $12.06 2013 <br /> Realign curves and widen roadway, congestion <br /> Improve freight <br /> mobility <br /> Enhance safety <br /> OR 74: Horseshoe Bend Curve Improve freight $5.31 2015 <br /> Correction mobility <br /> Re-align or rebuild sharp curve to Enhance safety <br /> improve safety. <br /> US 395: Mt. Vernon Improve freight $2.47 2013 <br /> Improvements mobility <br /> Widen and improve US 395 from Enhance safety <br /> <br /> junction with US 26 northward, <br /> including construction of bike/ped <br /> lanes. <br /> SW 4th Business Park Connector, Improve freight $4.0 2013 <br /> Ontario (Malheur County) mobility <br /> Build new north-south collector road Enhance safety <br /> to connect Ontario Business Park to <br /> SW 4th Avenue. <br /> 63 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.