11 1 1 1 <br /> ~ ~ 11 1 ~ I ~ 1 <br /> Project Objectives Est. Cost Est. Start of <br /> (millions) Construction <br /> Gateway Street at Beltline Reduce traffic $10 2010-2015 <br /> (Unit 2} congestion <br /> Improve intersections and re-align Enhance safety <br /> Gateway Street to improve opera- <br /> tion of I-5 /Beltline interchange. <br /> I-5: Linn Co. Line - OR 34 Reduce traffic $100+ <br /> The project would widen I-5 (likely congestion <br /> to 3 lanes each direction), modify Improve freight <br /> interchange connections to accom- mobility <br /> modate added travel lanes. Project Enhance safety <br /> will also close the View Crest and <br /> Murder Creek Interchanges north of <br /> <br /> Albany and replace with a new inter- <br /> change near Tank Farm Road. <br /> I-5 at Beltline Interchange Reduce traffic $175 <br /> The project would rebuild the exist- congestion <br /> ing interchange. Project will provide Improve freight <br /> free flow ramp connections between mobility <br /> I-5 and west Beltline Highway, add Enhance safety <br /> capacity across I-5, and improve the <br /> Gateway intersection area. Proj- <br /> ect will also add auxiliary lanes on <br /> Beltline between Coburg Road and <br /> I-5, and add auxiliary lanes on I-5 <br /> between Beltline and I-105. <br /> Beltline: River Road -Coburg Reduce traffic $250 <br /> Road congestion <br /> The project would improve capacity Improve freight <br /> on Beltline Highway, likely with 3 mobility <br /> lanes in each direction. Project will Enhance safety <br /> add capacity across the Willamette <br /> River in the area. Project will also <br /> modify interchanges within the seg- <br /> ment. Project has not yet begun <br /> environmental documentation. <br /> Newberg Dundee Transportation Reduce traffic $550 <br /> Improvement Project congestion <br /> The project would build a multilane Improve freight <br /> bypass from Rex Hill to Dayton on m o b i I i ty <br /> OR 18. Project includes 4 inter- Enhance safety <br /> changes and several local road con- <br /> nections/modifications. Alocation <br /> level EIS for the project has been <br /> completed. <br /> The OTC identified this as a project <br /> of statewide significance. <br /> 55 <br /> <br />