11 1 1 1 <br /> ~ ~ 11 1 ~ I ~ 1 <br /> Region Project Name Route Description Cost <br /> <br /> 4 Bend new signal US 97 SB onramp at Empire Ave in $500,000 <br /> Bend <br /> Region 4 subtotal $6,600,000 <br /> Region Project Name Route Description Cost <br /> 5 US 395: South- Hwy 28 Reconstruct intersection to $1,250,000 <br /> gate Place Inter- include NB left turn refuge <br /> section Improve- and new signal. <br /> menu <br /> 5 US 20: Monroe Hwy 7 Provide proper truck right $1,100,000 <br /> at Broadway turning radius from Broad- <br /> Intersection Im- way onto Monroe. Modify <br /> provements, existing signal as needed. <br /> May need to coordinate with <br /> future 3-Lane on Monroe(?). <br /> 5 Region 5 Signal Various Replace all 170/HC11 con- $1,500,000 <br /> Upgrades, Incl, trollers with the new 2070 <br /> 2070 Controllers standard. Includes Cabinet <br /> replacements, minor opera- <br /> tional improvements, com- <br /> munication, Count Down <br /> PED Signals, other misc. <br /> improvements. Site by site <br /> improvements as needed. <br /> 5 Region 5 Sig- Various Replace existing 3L Heads $150,000 <br /> nal 3L Head with 6L Heads to improve <br /> (Protected Left the efficiency of the intersec- <br /> Turns) to 6L tions during Off-Peak times <br /> Heads (Prot/Per- where gaps are present. <br /> missive w/ FYA) <br /> Conversions <br /> 5 US30/OR82: Hwy Install video detection to re- $35,000 <br /> Adams Avenue at 66/10 duce congestion and improve <br /> Spruce/Hwy 82 signal efficiency. Roadway <br /> Video Detection, is fairly new concrete and <br /> boring conduit and adding <br /> junction boxes is not cost <br /> effective. <br /> 5 US 30: La Hwy 66 Reconstruct Intersection and $1,250,000 <br /> Grande-Baker install signal. <br /> Hwy at Hughes <br /> Ln./Pocahontas <br /> Rd. Intersection <br /> Improvements <br /> 45 <br /> <br />