-Jenifer Willer <br />September 1o, <br />Page 4 - <br />Labor Classification <br />Hourl , - Rate <br />''Estimated Hours <br />Labor Fee- <br />Princi al <br />$156.00 <br />16 <br />.$2,496 <br />Pro'ect Engineer. <br />$115.0 <br />96 - <br />$11040 <br />FVM/Senior. Technician _ <br />$72.0 <br />79'.: = <br />$5 <br />Draftin <br />$66.00 <br />4 <br />$264 <br />Clerical . <br />$66.00 <br />4 <br />$264 <br />Labor. Subtotal . <br />199- <br />$f%752 <br />:.Emease Itemization <br />Basis <br />'Unit Rate : <br />Quanti D: - <br />Total <br />F'`D Testin <br />hr. <br />$255 <br />: '6 <br />$1,530 <br />FVM'Mobilization <br />mile <br />$0.84 <br />''250. <br />:. $200 <br />C2Ej!jg <br />ea. <br />$9.25 <br />8 <br />$74 <br />8- inch'dia. bit & atch : <br />inch de th <br />$3.50. <br />48 <br />$165 <br />Corgi Vehicle <br />Hole <br />$0.80 <br />250 <br />$200 <br />Traffic Control <br />cost +10% <br />$1 9 548 <br />B.orLn Subcontractor <br />cost +10 ° /0 <br />$935 <br />. <br />Mi1ea e <br />mile <br />$0:585 - <br />500 <br />$293 <br />Expense p Subtotal <br />$4,947 <br />=Total Estimated Fees <br />$24,699 <br />