New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Levy for Street Repairs
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Levy for Street Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:58:42 AM
Creation date
10/10/2008 1:08:22 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Road Repair
PW_Subject
Tax levey for street repairs - survey attached
Document_Date
1/28/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~ ' <br />is possible.that pavement capital preservation efforts could be undertaken as part of a project that also <br />included system capacity enhancements. In that case, pavement preservation bond funds would only be <br />•' allocated for the preservation-related components, and system capacity enhancements would be funded <br />with SDCs or other funds. . . <br />Off-street bike/pedestrian path capital preservation activities: The City currently does not <br />allocate any ongoing funds for off-street bike path capital preservation. A portion of pavement <br />preservation bond funds could be used to overlay or reconstruct existing bike path lanes or, if the council <br />were to so choose, to expand the local on- and off-street bicycling system. . , <br />Proposed list of high-profile projects: A proposed list of high-profile projects. is iricluded as <br />= Attachment A. The criteria for choosing these projects were: , <br />• Citizens have provided input about the unsatisfactory condition of certain major streets that are <br />in need of reconstruction, ~and several of those have been included in this illustrative list. When <br />survey results are available, the project list may change. <br />• According to the American Public Works Association, the cost of reconstructing a road on which <br />maintenance has been deferred is five times as much as the cost to perform a timely'overlay. <br />One of the most cost-effective uses of pavement preservation dollars is to perform overlays on <br />streets which are identified as likely to fa11 into the much more expensive "reconstruct" category <br />if tlie overlay treatment is not performed in the upcoming year. Several of these "at risk" streets <br />, are included in the illustrative list of street projects to be funded first with bond proceeds. <br />• At the December 10 council work session, there was interest in ensuring that any list of projects <br />to be associated with the bond measure be geographically distributed throughout tlie community <br />, to ensure that all areas of the City receive a benefit from the first use of bond proceeds. An <br />• illustrative map of proposed projects by geographic distribution is also shown in Attachment B. <br />The City currently does not have a source of funding for the City's share of street improvement projects <br />that have been recognized by the council, such as the City's share of costs for the CrestlFriendly/Storey . <br />or Maple/Elmira street improvements. The bond measure could include funding for the City's share of <br />these or other special street projects which the council felt would be appropriate for bond measure <br />funding. . <br />Portion allocated to accommodate future changes in project priorities: Over the life of the <br />bond measure, pavement conditions or circumstances could change, making it more fiscally prudent or a <br />higher community priority to spend funds on projects which were not anticipated in 2008. For example, <br />current street condition ratings, as determined by the City's pavement management system and <br />additional testing, may change due to unanticipated severe weather which might warrant priority . <br />overlays on streets not previously identified as "at risk" or not otherwise due for an overlay for several <br />years. This cafegory could also include contingency funding for any of the high-profile projects, where <br />actual costs of preservation treatments exceed current cost projections. ~. • <br />Engineering design and project management costs: Iri addition to the core costs of a <br />. preservation treatment, certain engineering and administrative,functions are performed as an inherent <br />part of any capital project and require project funding. A few common examples include: <br />• Testing of the existing pavement to verify the condition of the pavement and ensure that the <br />appropriate pavement preservation treatment is done in the right timeframe; <br />• <br />City Council Agenda page 7 F:\CM0~2008 Council AgendasV~I080128\5090128B.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.