• ...+.4 ` <br /> 4.2 To ~.nsure long-term success, mitigation efforts shall give priority to'establishing or teestab- <br /> lishing the basic. hydrologic conditions necessary to meet the stated mitigation objectives. <br /> 4.3 Mitigation efforts shall concentrate on restoring wetland type, habitat, functions and <br /> values that represent the .historic,. ecological landscape of the Amazon Creek basin. <br /> 4.4 .Mitigation efforts shall use local, native plant species. <br /> 4.5 .Mitigation efforts shall be designed and constructed to m;n;m;ze the level of on-going <br /> maintenance. <br /> 4.6 Develop, adopt and implement a comprehensive wetland mitigation program. <br /> 4.7 Mitigation efforts shall occur in the priority areas as depicted on Map 3, Wetlands <br /> Recommendations. <br /> 4.8 Develop a wetland mitigation overlay zone where mitigation is a permitted use, and <br /> apply it to areas targeted as future mitigation sites as shown on Map 3. ` <br /> 4.9 Establish, develop and maintain a regional wetland mitigation bank that will provide <br /> mitigation credit capacity for the West Eugene Wetlands Study Area, the balance of <br /> the Eugene urban growth boundary and the Eugene Airport proper. <br /> 4.10 To be eligible for participation in-the mitigation bank, wetland impact regtiests must • <br /> be consistent with the goals, policies and provisions of this Plan. <br /> 4:11 Require all mitigation efforts to; participate in a comprehensive monitoring and <br /> maintenance program. <br /> 4.12 Develop a system that provides security against unsuccessful mitigation efforts, such <br /> as a bond or other financial guarantee. <br /> <br /> H 4.13 Amend applicable City. codes, policies and maintenance operation procedures to <br /> comply with the provisions of the this Plan and implementation measures. <br /> 4.14 All mitigation must be completed in advance or concurrent with development. <br /> 4.15 Unless on-site mitigation would better. meet the goals and policies of this Plan, mitiga- <br /> tion efforts shall occur according to the provisions of the regional mitigation bank <br /> provisions. <br /> 4.16 Enhancement of existing wetlands can be used to add functional credits to the <br /> wetland mitigation bank. <br /> • <br /> Yage 3 -Appendix B <br /> MOA For West Eugene Wetlands Mitigation Banking Program <br /> <br />