Cost Estimate design scope and assumptions U8/O1/2008 <br />lA - Franklin Blvd eastbound right turn pocket lane onto southbound Agate Street with <br />yield control, <br />~ Scope: . <br />Widen the south side of Franklin Blvd from Agate to 515-feet west of Agate in order to <br />construct a right turn lane: Construct 12-foot wide, 275-foot long full width lane and <br />240-foot long 20:1 tapered right turn lane on the south side of Franklin Blvd with a new <br />median and pocket lane through to southbound Agate. <br />Assumptions: ~ <br />Construct new 12-foot lane with 9-inches of HIVIAC on 12-inches of sub-base rock. <br />Pedestrian refuge/pocket lane raised median island. <br />. Constritct new curb and gutter; where removed. <br />' Construct new sidewalk, where removed. <br />Construct four new ADA curb ramps, one replacement and three in island. <br />Traffic signal pole to remain as existing. <br />Relocate two pedestrian push button poles and wiring. <br />Relocate four streetlights and wiring. <br />Replace and relocate two curb inlets and piping: ~ ~ <br />Reconfigure the northern noise of the curbed median on Agate for improved truck <br />turning. <br />Landscaping adjacent to new lane and in reconfigured median. <br />New striping and legends for new pavement. . <br /> <br />