New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
POS Vision Values Goals
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
POS Vision Values Goals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:59:13 AM
Creation date
9/30/2008 1:53:34 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Vision Values Strategic Goals 2008-2012
Document_Date
9/30/2008
External_View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Vision, Values, and Strategic Goals 2008-2012 <br />OUR STRATEGIC GOALS 2OOg-2~12 <br />Goal 1: Balance the need to provide new parks and facilities with the need to protect and <br />preserve public investment in existing parks and facilities. <br />Action 1.1: Determine the unit costs for maintenance and operations activities and use the <br />information to: <br />o Evaluate impacts of proposed parks and facilities, including the cost of bringing <br />newly acquired sites to a maintainable condition; <br />o Establish maintenance service levels based upon available resources; and <br />o Develop operations management plans for specific parks and open spaces. <br />Products: <br />1. Analysis of the costs of maintaining the park and open space system, showing <br />costs by activity type, park or natural area, park type, maintenance modes, etc. <br />2. Documented maintenance standards, including at least two levels of maintenance <br />for each component. <br />3. Resource management analysis by type (neighborhood, community, natural area, <br />etc.) and plans for individual, representative parks and open spaces. <br />4. Operations management plans. <br />Measures: <br />1. By December 2008, all maintenance and operations activities will be included in <br />the decision tool that is used to analyze projected costs for new parks. <br />2. By 2010, maintenance service levels will be established for all activities. <br />3. By 2012, develop operations management plans for 25% of parks and open space <br />acreage. <br />Action 1.2: Develop system-wide plans for major renovations of critical system components for <br />which maintenance has been deferred, including: <br />o Children's play areas <br />o Skateparks <br />o Sports fields and Courts <br />o Vegetation <br />o Natural Areas <br />o Trails <br />o Restrooms <br />o Irrigation systems <br />o General park development features such as walkways, signs, lights, benches, picnic <br />tables, exercise stations, shelters, medians, stormwafer facilities and parking areas. <br />Products: <br />1. Inventory of critical system components with age, condition, and lifecycle. <br />2. Established priorities for each type of component and for each site. <br />3. Timeline for renovation projects based upon expected resources. <br />\\CESRV 200\public\SharedWleetings~POS. Meetings\POS-Mgmt\StrategicPlanning\Strategi c-Goals-OS-16-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.