New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4535 2009-00007
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4535 2009-00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:43:40 AM
Creation date
9/16/2008 5:11:19 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004535
GL_Project_Number
985246
COE_Contract_Number
2009-00007
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/15/2008 10:27 FAX 541 682 5366 CITY EUGENE P4I ENG 0 003/007 <br />' ~; <br />~. <br />00330.$1 Excavation Basis Measurement <br />(A)[lp) Excavation Disposal Haul -Material determined to be unsuitable for coztstxvction will be measured <br />by volume in each truck prior to leaving the site. Contractor and Engineer shall agree upon the <br />quantity in each vehicle prior the vehicle leaving the site. <br />00330.90 Payment -Excavation Disposal haul will be paid for by the Cubic Yard. <br />00490.82 )Gump sum basis -The reconstruction of the existing outlet structure will be measured by the lump <br />sum method. <br />00490.91 Lump sum basis <br />Reconstruction of the outlet structure will be paid for on a lump sum basis. <br />01040.88 Miscellaneous <br />(ADD) Boulders -Contractor shall provide boulders to stockpile areas determined by the Engineer. <br />Stockpile areas shall not impede equipment movement during open channel construction. Stockpiles <br />will allow efficient retrieval of material to be used in construction. The Engineer may identify up to <br />three boulder stockpile azeas along the open channel construction area. <br />Note- Attached is the Pre-Hid Meeting attendees' list dated August 11, 2008. <br />If you have questions about this addendum or the project, please call Doug Singer at {541) 682-8460. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting the <br />signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, will be <br />considered informal. <br />r,-~ <br />~ r,: <br />GG~~ ~- ~ - <br />Mark Schoening, P.E/ <br />_ City Engineer <br />Receipt acknowledged and conditions agreed <br />this Z~s day of Al)C~t)ST , 200$. <br />DBA: DELTA CONST. C0: <br />Bidder: BABE CONSTRUC710N CO. DBA: DELTA CONCRETE <br />Addendum No. 1 -Job #4535 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.