New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4535 2009-00007
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4535 2009-00007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:43:40 AM
Creation date
9/16/2008 5:11:19 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004535
GL_Project_Number
985246
COE_Contract_Number
2009-00007
Retention_Destruction_Date
10/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/15/2008 10:27 FAX 541 682 5366 CITY EUGENE Pw ENG <br />~; <br />Publlc Works <br />Engineering <br />City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />(541)682-5560 <br />(541) 682.8410 Fax. <br />ADDENDUM NO.1 <br />TO THE CONTRACT DOCUMENTS AND SPIBCIFICATIONS FOR <br />PINE CANYON DRIVE STdR1vI't'VATERlMPROVEMENT BETWEEN <br />]PINE CANYON DRIVE AND E. 38T" AV)~IVTJE <br />August 15, 2008 JOB #4535 BID NUMBER 27 <br />~ 002/007 <br />TO ALL PLANHOLD)EXtS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. All other conditions shall retttain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and the <br />total of these bid items then add in the appropriate place on the bid form. <br />CI~,AI\'GES TO BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 07/31/2008 <br />(ADD) Revised Bid Schedule dated 08/14/2008 <br />CHANGES TO SPECIAL PROVISIONS: <br />00330 )Earthwork <br />00330,00 Scope <br />Earthwork includes work to grade and contour existing ground to the final form (force account work) <br />and may also include the hauling and disposing of gobbed material, soil and debris determined by <br />the Engineer to be unsuitable for on-site work. Unsuitable material from the project shall be <br />delivered to an approved disposal site. The disposal site shall be identified by the contractor in <br />writing and approved prior to hauling material ofiE site. <br />00330.02 Definitions <br />Excavation Disposal /Tool Material -This bid item includes the excavation and removal of <br />unsuitable material to an approved site. <br />00330.42 Embankment, Fill and 8ackftlls <br />{ADD) Contractor shall provide riprap (other than boulders), 3"-0 and'/."-0 aggregates to stockpile areas <br />detenmined by the Engineer to be within equipment reach of the open channel construction area. <br />Stockpile areas shall not impede equipment movement during open channel construction. Stockpiles <br />will allow efficient retrieval of material to be used in constr-retion. <br />Addendum No. 1 - Xob #4535 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.