New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4376 Contract 2009-00006 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4376 Contract 2009-00006 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:46:06 PM
Creation date
9/8/2008 2:24:32 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004376
GL_Project_Number
965374
Identification_Number
2009050135
COE_Contract_Number
2009-00006
Retention_Destruction_Date
12/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
paid for one time at each location. Any other sawcutting by the contractor is incidental to the <br />corresponding work and no additional payment will be made. <br />ADD} 00330.12 Borrow Material - Imported borrow materials may supplement borrow materials <br />originating from required excavations upon approval by the Engineer that on-site materials have <br />been used as far as practical. <br />ADD} 00330.83 Imported Borrow -Required imported borrow materials will be measured by the ton <br />in the hauling vehicles, according to 00190.10. <br />(ADD) 00330.95 Imported Borrow -Accepted quantities of required imported borrow materials will <br />be paid for at the Contract unit price per ton. <br />(REVISE} 00754.90 General -The sentence that begins "Costs submitted by. the Contractor for "Asphalt <br />Cement in HMAC Per Ton Of HMAC Complete" should read; <br />Costs submitted by the Contractor for "Asphalt Cement in HMAC Per Ton Of HMAC <br />Complete", for any HMAC bid item, over thirty-five X35} dollars per ton will be considered <br />unbalanced and the bid will be rejected. <br />(REPLACE) 00990.90 General -Pay Item (k) with "Junction Box, Type _". <br />(REPLACE) 00990.90 General -Replace the notes added by Special Provision for item (j) as follows: <br />Item (j}includes payment for furnishing and installing conduit as identified in the plans for <br />future detector loops and interconnect. No electrical wire will be installed as part of this item. <br />(REPLACE) 00990.90 General -Replace the notes added by Special Provision for item (k) as follows: <br />Item (k) includes payment for furnishing and installing junction boxes as identified in the plans <br />for future detector loops and interconnect. No electrical wire will be installed as part of this <br />item. <br />ADD} 00990.90 General -The fallowing note after the paragraph that begins "Item ~l}includes"; <br />In Item (k) above the type of Junction Box to be installed will be inserted in the blank. <br />(ADD) 01030.90 General -Add the following Pay Item (previously deleted by City Amendment): <br />Pa item Unit of Measurement <br />~~} Seeding Mob~~ization ...............................................Each <br />REVISE} 0I030.90 General -The note that begins "Item (a} includes all lobar and transportation of <br />materials and equipment" should begin "Item ~i}includes...." <br />ADD} 01040.43~c}Hauling and Spreading -Topsoil shall be brought to grade of new and existing <br />sidewalk and new curb spillways prior to the application of permanent seeding. <br />CHANGES TO PLANS: <br />(REVISE} Sheet 2B Grassy Bio-Swale Detail -The note that reads " 3"Mulch as Specified ~Typ.}" shall <br />be revised to "112" -1"Depth of Mulch as Specified ~Typ.}." <br />Addendum No.1-Job #4376 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.