ADDENDUM NU.1. <br />TQ THE CONTRACT DOCUMENTS AND SPECIFICATIONS FUR <br />NORTH GAME FARM ROAD FROM OLD COBURG ROAD TO I-5 <br />August 15, 2008 JOB #437b BID NUMBER 25 <br />TD ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specif tally <br />shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and the <br />total of these bid items then add in the appropriate place on the bid form. <br />CHANGES T4 BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 07/24/2008 <br />(ADD) Revised Bid Schedule dated 08/15/2008 <br />CHANGES TO BID BOOK: <br />ADD} Copy of "Application and Permit to Occupy or Perform operations Upon a State Highway". <br />CHANGES T(~ SPECIAL PR4VISIUNS: <br />ADD} Oo120.15 Consideration of Conditions to be Encountered -Cross-Sections on 50' stationing <br />and logs of the pavement boring are available for examination by the Bidders at the Engineer's <br />Office. <br />001.30.50 Execution of Contract and Bonds <br />REVISE} ~a} By the Bidder ~-Change 10 Calendar Days to 5 Working Days. <br />REVISE} fib} By the Agency _ Change 10 Working Days to 5 Working Days. <br />ADD} 001.50.55 Cooperation with Other Contractors - To the end of the last sentence "and their <br />Work." <br />ADD} 0031.0.91. Separate Unit Basis -Add the following Pay Item and note: <br />Pa Item Unit of Measurement <br />~g~ Pavement Sawcutting ............................................... Foot <br />Item fig} applies to the final pavement sawcutting in order to provide neat lines to abut new <br />pavement for pavement widening and at the beginning and end of the pavement work and will be <br />Addendum No.1-Job #437b Page 1 <br />