New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4376 Contract 2009-00006 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4376 Contract 2009-00006 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:46:06 PM
Creation date
9/8/2008 2:24:32 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004376
GL_Project_Number
965374
Identification_Number
2009050135
COE_Contract_Number
2009-00006
Retention_Destruction_Date
12/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00745.49(b)(3) Moving Average Maximum Density (MAMD) Method <br />(Replace) The table and note at the bottom of the table with the following: <br />Maintenance New Construction <br />Overlays Level 1, Level 2 Level 4 <br />Course of Construction and Level 3 HMAC HMAC <br />First Lift 91.0 92.0 92.0 <br />Single 91.0 92.0 92.0 <br />All Other 92.0 92.0 92.0 <br />If the minimum compaction required for any portion of a lift width, at any station, is lower than <br />the rest of the lift width, the lower compaction requirement will be used for the entire width of <br />the lift. <br />(Delete) The last paragraph of this subsection. <br />00745.60 Correction of Defects <br />(Replace) This subsection with the following: <br />Correct any defects in materials and work, as directed, at the Contractor's expense as <br />follows: <br />(a) Fouled Surfaces -Immediately repair, clean and retack fouled surfaces that would <br />prevent full bond between successive lifts of mixture. <br />(b) Boils, Slicks, and Oversized Material -Immediately replace boils, slicks, and <br />oversized materials with fresh mixture. <br />(c) Segregation -Take immediate corrective measures when segregation or non- <br />uniform surface texture is occurring in the finished mat. If segregation continues to <br />occur, stop production until a plan for providing uniform surface texture is approved by <br />the Engineer. <br />(d) Roller Damage to the Surface -Immediately correct surface damage from rollers <br />with additional fresh mixture or by other means approved by the Engineer. <br />(e) Longitudinal Joints -Take immediate corrective measures when open longitudinal <br />joints are being constructed or when the elevation of the two sides of a longitudinal joint <br />do not match. If problems with the longitudinal joint continue to occur, stop production <br />until a plan for providing tight, equal elevation longitudinal joints is approved by the <br />Engineer. <br />(f) Nonspecification Compaction -Take immediate corrective measures when the <br />specified compaction density is not being achieved. <br />(g) Other Defects -Remove and replace any HMAC that: <br />Special Provisions -Job #4376 Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.