New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4376 Contract 2009-00006 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4376 Contract 2009-00006 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:46:06 PM
Creation date
9/8/2008 2:24:32 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004376
GL_Project_Number
965374
Identification_Number
2009050135
COE_Contract_Number
2009-00006
Retention_Destruction_Date
12/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Do not work within the critical root zone of marked trees unless written approval is <br />obtained from the Engineer. Be responsible for any damage to or removal of marked <br />trees. Tree damage will be determined by a certified arborist selected by the Engineer. <br />00330.03 Basis of Performance <br />(Add) Perform all earthwork under this Section on the excavation basis. <br />00350.10 General <br />(Add) Provide manufacturer's certifications complying with 02320.10(c) for the following <br />geosynthetic(s): <br />Certification <br />Geotextile Level A Level B <br />Subgrade ........................................................ X <br />00445.20 Contractor's Options <br />(Replace) This sub-section with the following: <br />The Contractor may use the following pipe types for the storm pipe on this project: <br />• Reinforced Concrete Pipe, Class IV <br />• Polyvinyl Chloride Pipe (PVC) <br />• Corrugated Aluminum Pipe <br />• Corrugated Steel (Aluminized) Pipe <br />If the Contractor opts to use a metal type pipe, prior to ordering any metal pipe for use <br />on this project, the Contractor shall provide an engineering report, stamped by a <br />licensed civil engineer, documenting that the pipe meets the service life requirements <br />(75 years) for this project under the Metal Pipe Design Policy in the City of Eugene <br />Public Improvements Design Standards Manual available at www.eugene-or.gov on the <br />Public Works Engineering Division portal site. <br />00445.76 Contractor's Warranty <br />(Add) 00445.76 Contractor's Warranty - Furnish a Warranty for the Sanitary, Storm, Culvert <br />and Siphon Pipe Work according to 00170.85(b), for a Warranty period of one year. The <br />Warranty period will start at the issuance of the Third Notification. <br />For purposes of the Warranty, the Sanitary, Storm, Culvert and Siphon Pipe Work will be <br />deemed to have defects when: <br />• Pipe line and/or grade deviates from 00445.40 as a result of sags in the line; <br />• Joints are not secure and tight by visual examination and/or pipe is visibly leaking; <br />• Pipe has visible breaks, holes, cracks, protruding services, protruding gaskets, or <br />deformities such as creases, protrusions, deflection or flattening, or other defects. <br />Special Provisions -Job #4376 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.