New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4559 2G Construction Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4559 2G Construction Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2011 1:04:16 PM
Creation date
9/3/2008 11:57:40 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
No
External_View
No
GJN
004559
GL_Project_Number
985662
COE_Contract_Number
2009-00003
Retention_Destruction_Date
11/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(DEI,,)ETE) 4.1 BASIS OF PAYMENT <br />A. Pay item "Powder Coated TS support structure" <br />Cuexc'ES TO PLAN SHEETS. <br />(~D) S>[~ET S,IFOOTING DETAILS <br />Footing Detail A -Add note "Hand Rail p wire a s lmaller distanceN In all cases, 11 inches shall <br />the tube steel, unless the field conditions req <br />be the minimum." <br />(C~GE~ SHEET 6, OVERLOOK`PLAN & ELEVATION <br />Change note on Overlook Framing Plan detail from `"I'S Zx4x0.1875" to TS 2X5x5116" <br />(~D) gHEET 6, OVERLOOK PLAN & ELEVATION <br />Add note on Overlook 1~raming Plan "the overlook tube steeld s do ected by the Engin ~ across <br />bracing to be installed to the bottom of <br />(~D) SHEET 6, OVERLOOK PLAN & ELEVATION <br />Add general note: "The maximum distance from the bottom of the pond to the bottom of the <br />tube steel is 6 feet " <br />~App~ SI~ET 10, O~ItI,00K CONNECTION DETAILS <br />Add note "The Contractor may propose an alternate connection detail, including pre- <br />manufactured timber support brackets, or other methods of equal or greater strength than showt- <br />on the drawings." <br />If you have questions about this addendum or the project, please call Chuck Mueller with the City of Eugene, at <br />(541) 682-5295. <br />All bidders shall ackno~+ledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting <br />the si ed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, <br />will be considered informal. <br />JP A- <br />~ F~l ~ <br />L.Mazk Schoenin , P.E. <br />V"City Engineer <br />Receipt acknowledged and conditions agreed <br />this 17 day of J~ 2008. <br />Bidder: ~ Inc. dba 2G Construction <br />By: <br />Page 2 <br />~tddendumNo. 1-Job #4559 <br />
The URL can be used to link to this page
Your browser does not support the video tag.