(DEI,,)ETE) 4.1 BASIS OF PAYMENT <br />A. Pay item "Powder Coated TS support structure" <br />Cuexc'ES TO PLAN SHEETS. <br />(~D) S>[~ET S,IFOOTING DETAILS <br />Footing Detail A -Add note "Hand Rail p wire a s lmaller distanceN In all cases, 11 inches shall <br />the tube steel, unless the field conditions req <br />be the minimum." <br />(C~GE~ SHEET 6, OVERLOOK`PLAN & ELEVATION <br />Change note on Overlook Framing Plan detail from `"I'S Zx4x0.1875" to TS 2X5x5116" <br />(~D) gHEET 6, OVERLOOK PLAN & ELEVATION <br />Add note on Overlook 1~raming Plan "the overlook tube steeld s do ected by the Engin ~ across <br />bracing to be installed to the bottom of <br />(~D) SHEET 6, OVERLOOK PLAN & ELEVATION <br />Add general note: "The maximum distance from the bottom of the pond to the bottom of the <br />tube steel is 6 feet " <br />~App~ SI~ET 10, O~ItI,00K CONNECTION DETAILS <br />Add note "The Contractor may propose an alternate connection detail, including pre- <br />manufactured timber support brackets, or other methods of equal or greater strength than showt- <br />on the drawings." <br />If you have questions about this addendum or the project, please call Chuck Mueller with the City of Eugene, at <br />(541) 682-5295. <br />All bidders shall ackno~+ledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting <br />the si ed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, <br />will be considered informal. <br />JP A- <br />~ F~l ~ <br />L.Mazk Schoenin , P.E. <br />V"City Engineer <br />Receipt acknowledged and conditions agreed <br />this 17 day of J~ 2008. <br />Bidder: ~ Inc. dba 2G Construction <br />By: <br />Page 2 <br />~tddendumNo. 1-Job #4559 <br />