1:41 FAX 541 591 <br />Public Works <br />Engineering <br />City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />(541) 682-5580 <br />(5x 1) 662-8410 Fax <br />ADDENDUM NO. 1 <br />TO TE[E CONTRA~wALK O F OOD ASTURE ISY.AND ROAD <br />DELTA PONDS <br />JULY 14, 2008 <br />JOB #4559 <br />BID NUMBER 21 <br />TO ALI. PLANHOLDERS: <br />The following changes shall amend and bons shall remain the tmedding documents only to the extent <br />specifically shown and noted. All other condr <br />Bidders shall incorporate the effects of these char atei lace onp he b d formitems included in this addendum and <br />the total of these bid items then add in the appropn p <br />C;d,,n,N GES Tn ~pECIAL PROVISIONS <br />00150.15 (a) Construction Stakes, Lines, and Grades: <br />(ADD) The City will provide ecnte Contractor shall layout andlconstruct thetentir project from these <br />elevation benchmarks- Th <br />points. <br />00180.50 Contract Time to Complete Work <br />(CHANGE) Change September 15, 2008 to September 30, 2008 <br />(DELETE) The second sentence. <br />(ADD) All work EXCl/PT the Guard Rail, m 008 a The Boardwalo must rema~n Ogosed toGhe public <br />must be completed by Novemberl4, 2 <br />until the Guazd Rails are in place. <br />SECTION 06125 -BOARDWALK <br />(DELETE) 1.2 SUBMITTALS <br />Paragraph A <br />(~D) 1.2 SUBMITT~S <br />Paragraph H "'The 2x4, 2x5, and SxS tube steel shall be powder coated rather than galvani2e - <br />Powder coating shall take place after any necessary welding is completed. All other <br />miscellaneous hazdware, and the fencing, shall be galvanized." <br />(REPLACE) 2.1 Paragraph B, Solid Wood Posts. <br />(~D) 2.1 Paragraph B, Solid 'Wood Posg on llumber, S4Sld wood posts and joists shall be clear <br />Western Red Cedaz, standard dimen <br />page 1 <br />Addendum No. 1-lob #4559 <br />