New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Sixth Avenue Under Construction from Oak to Olive Streets
COE
>
PW
>
Admin
>
Public Affairs
>
2000
>
Sixth Avenue Under Construction from Oak to Olive Streets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:45:41 PM
Creation date
8/29/2008 2:45:41 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
8/1/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> rf <br /> ~ _ <br /> August 1, 2000 <br /> CONTACT: Bud DeSantis, Project Manager, 682-5230 <br /> From Public Information Section, 682-5523 <br /> FOR IMMEDIATE RELEASE <br /> SIXTH AVENUE UNDER CONSTRUCTION FROM OAK TO OLIVE STREETS <br /> Motorists should consider using alternate routes through the Eugene downtown area for <br /> the next several weeks while work is being done on Sixth and Seventh avenues between Oak and <br /> Olive streets. <br /> Beginning early Thursday, August 3, traffic will be restricted to one lane on Sixth <br /> Avenue between Oak and Olive for five to seven days and the pedestrian crossings at Sixth and <br /> Olive will be closed as work is done on the underground wastewater system. Crews from Delta <br /> Sand & Gravel, working under contract with the Eugene Public Works Department, will dig up <br /> two locations on Sixth Avenue -one near Olive Street and the other midway between <br /> Willamette and Oak streets -and install new manholes to provide better access for ongoing <br /> maintenance of the wastewater system. <br /> Immediately following the wastewater system work, Delta will begin rebuilding the <br /> intersections on Sixth and Seventh avenues at Oak, Willamette and Olive streets to replace the <br /> existing badly deteriorated crosswalks and paving. The crosswalks will be replaced with tinted <br /> concrete scored similar to other crossings in the downtown area. That work is scheduled to <br /> begin Sunday, August 13, and be substantially completed by the end of August. _ <br /> (More) <br /> Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.