<br /> I. <br /> I~ s ~ t s <br /> - <br /> August 3, 2000 <br /> CONTACTo Brian Genovese, Project Manager, 682-5343 <br /> From Public Information Section, 682-5523 <br /> FOR IMMEDIATE RELEASE <br /> PAVING REPAIRS BEGIN ON THREE EUGENE STREETS <br /> Paving repairs will begin Monday, August 7, on three Eugene streets: West Amazon <br /> Drive (Fox Hollow Road to Martin Street), Norkenzie Road (Cal Young Road to Beltline), and <br /> Jeppesen Acres Road from Providence to Nirvana streets). <br /> The repair work includes digging up and repairing deteriorated portions of the roadbed, <br /> grinding off portions of the existing asphalt surface, applying a new asphalt surface, and, in some <br /> areas, upgrading sidewalk crossings to comply with the Americans with Disabilities Act. Eugene <br /> Sand & Gravel is the general contractor for the $380,000 project designed and managed by the <br /> Eugene Public Works Department.. <br /> During daytime construction hours, lanes may be closed in the work zones. On West <br /> Amazon Drive, at least one lane will remain open at all times for southbound traffic. <br /> Northbound traffic can use East Amazon Drive as an alternate route. On Norkenzie and Jeppesen <br /> Acres, plans call for one lane of traffic to be open in each direction although at times there may <br /> be delays and traffic controlled by flaggers. Portions of sidewalks and bike lanes will be closed <br /> at times. Signs will direct pedestrians and cyclists to alternate routes. . <br /> I <br /> (more) <br /> Public Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> I <br /> <br />