New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Three Neighborhood Parks in Eugene are under Construction
COE
>
PW
>
Admin
>
Public Affairs
>
2004
>
Three Neighborhood Parks in Eugene are under Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2008 3:25:56 PM
Creation date
8/27/2008 3:25:56 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
POS
PW_Subject_Public_Affairs
POS
External_View
No
PWA_Release_Date
8/27/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 08/27/04 FRI 10:28 FAX 541 682 4882 EUGENE PW MNTNC & POS PW ADMIN 17j002 <br /> NEWS RELEASE Park Construction <br /> PAGE 2 <br /> August 27, 2004 <br /> In south Eugene at 3300 University Street, near the West Amazon Parkway, Milton Park is already <br /> taking shape. This smal~but lovely neighborhood park will be substantially improved with better paths into <br /> the park, play equipmenK and an open grass play area, benches, new trees and plants, and new irrigation to <br /> maintain the landscaped areas. So far, all excavation has been completed, most of the concrete work has <br /> been finished and the ir~pgation system is currently being installed. Local construction contractor Triton <br /> Group is also working ci~sely with Sperry Arborists to help preserve the large oaks on the site during <br /> construction. The park i~ expected to be completed in September. <br /> For more information about Awbrey or Milton parks, call 682-4906. For more information about <br /> Arrowhead Park, call 6s~2-4915. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.