New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-95-19-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-95-19-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:53:30 PM
Creation date
8/15/2008 3:37:10 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Stormwater
Document_Date
8/20/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commission under section 170 of the ~ Atomic Energy Act of 1954, as <br /> amended, or, for the purposes of any removal or remedial action, any <br /> release of source by-product ~ or special nuclear material from any <br /> processing site designated under section 102(a)(1) or 302(a) of the Uranium <br /> Mill Tailings Radiation Control Act of 1978; <br /> (d) A discharge in accordance with federal, state, or local <br /> permits of the Lane Regional Air Pollution Authority, with a National <br /> Pollutant Discharge Elimination System Permit, with waste discharge <br /> requirements established by the Oregon Department of Environmental <br /> Quality (DEQ), or with the industrial wastewater pretreatment <br /> requirements of the Industrial Source Control Section of the City's Public <br /> Works Department's Wastewater Division; <br /> (e) The normal application of fertilizer; <br /> (f) Application of pesticides as defined by ORS 634, when such <br /> application is made within the provision of applicable state and federal <br /> regulations; <br /> (g) Application of agricultural lime, gypsum and other <br /> agriculturaUhorticultural soil amendments when made for that purpose and <br /> according to current industry practice; and <br /> (h) Application of water-based paint, when used as athletic field <br /> marking. <br /> va . Actions taken to eliminate, cleanup, or remove a released pollutant; such <br /> actin 2~s may be necessary due to the threat of a release of a pollutant; such actions as <br /> may a necessary to monitor, assess, and evaluate a release, or threat of release, of a <br /> pollu C; the disposal of removed material; other actions as may be necessary to prevent, <br /> or mitigate damage to the public health, safety, or welfare which may otherwise <br /> resin frgm a release, or threat of release, of a pollutant; provision of security fencing or <br /> other measures to limit access; provision of alternative drinking and household water <br /> suppl esr temporary evacuation and housing of threatened individuals. <br /> Removal action costs. Reasonable costs which are attributable to or associated with <br /> a re oval action at a facility, including but not limited to the costs of administration, <br /> inves ig~tion, legal or enforcement activities, contracts and health studies. <br /> meat. The same as a prior violation. <br /> ignificant. (As in significant threat, significant consequence.) Factors that <br /> cons 'tuf <br /> e a significant threat or significant consequence include, but are not limited to: <br /> ~I, 1. Discharge would result in a spill of reportable quantity as defined <br /> >~y the Department of Environmental Quality, Oregon Fish and Wildlife, or other <br /> state or federal agencies. . <br /> 2. Discharge would have visible, acute, or chronic impact on the <br /> <br /> Stormwater System Administrative Rule - 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.