(I) Special events of community interest including parades and public gatherings. <br /> ? Organizers of events held in Washington-Jefferson Park occasionally <br /> request a partial closure of Washington Street. These half-street closures <br /> are easily accommodated on a one-way street. Two-way operation will <br /> make ahalf-street closure more difficult, as it will require both a lane <br /> closure and a detour plan. <br /> (m) Construction within or adjacent to the street. <br /> ? Two-way operation will complicate traffic control plans around <br /> construction sites in the street. Construction adjacent to the street rriay be <br /> facilitated, as construction vehicles could approach the site from either <br /> direction. <br /> <br /> (n) Establishing conditions upon the use of parking. <br /> ? Except for two parking bays on the west side of the street, parking is <br /> .prohibited on Washington Street between ist Avenue and 5th Avenue. <br /> Parking is permitted,on Washington Street between 1st Avenue and Clark <br /> Street. There will be no changes to parking facilities, other than to reverse <br /> the direction of permitted parking on the west side of the street. <br /> a <br /> <br />