New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-96-02
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-96-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:53:39 PM
Creation date
8/15/2008 2:51:31 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Washington Street
Document_Date
1/22/1996
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> i <br /> ~ Administrative Order <br /> of the <br /> Traffic Engineer of the City of Eugene, Oregon <br /> Establishing Two-Way Traffic <br /> n Washington Street between 5th Avenue and Ctark Street <br /> Criteria for d~inistrative Action <br /> The administr ti action of the Traffic Engineer of the City of Eugene, Oregon, establishing two- <br /> <br /> ' way traffic on ~shington Street between 5th Avenue and Clark Street is based on the followin <br /> criteria: I, g <br /> (a) Traffic engineering principles and traffic investigations: <br /> ? Roadway and intersection capacity: two-way operation will not cause <br /> capacity problems on the roadway or at any of the intersections. <br /> ' ? I~ Safety: In the six years from 1989 through 1994, there were 17 reported <br /> accidents on Washington Street between 5th Avenue and Clark Street. <br /> Thirteen of the accidents occurred at Sth Avenue. The two-way operation <br /> may result in a slight increase in traffic accidents, as it requires motorists, <br /> bicyclists, and pedestrians to observe traffic coming from two directions. <br /> Traffic conditions and accidents will be monitored to determine if any <br /> i <br /> changes are necessary to increase the safety of the two-way street. <br /> ? ' Transit: Two-way operation will increase possible transit options. <br /> Traffic signs, markings and signals: Motorists will be informed of changes <br /> with appropriate signing. Signs, markings and signals will be added, <br /> removed, or modified as needed to comply with the Manual on Uniform <br /> Traff <br /> c Control Devices. <br /> ' II~ Intersection Control: Traffic signal controls will be added to the traffic <br /> signal at Sth~lvenue for southbound Washington Street traffic. At 1st <br /> Avenue, the`existing east-west stop controls will be changed to north-south <br /> controls. At Clark Street, the existing Stop control for westbound Clark <br /> Street will be retained and the Stop control for southbound Washington <br /> ' Street traffic will be removed. <br /> Railroad crossing: Southern Pacific will move the crossing gate at the <br /> southwest corner of the crossing to the northwest corner. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.