<br /> r <br /> Attachment #1 of Exhibit A <br /> Administrative Order No. 58-96-06 <br /> Page 1 of 3 <br /> . AMENDMENTS <br /> TO <br /> CITY OF EUGENE, ENGINEERING DIVISION, PUBLIC WORKS DEPARTMENT <br /> SYSTEMS DEVELOPMENT CHARGE METHODOLOGIES <br /> EFFECTIVE, FEBRUARY, 1993 <br /> COMPLETE COPIES OF THE FULL METHODOLOGY ARE~AVAILABLE FOR INSPECTION AT THE..FULLOWING.LOCATIONS: <br /> Public Works Department . The Eugene Public Library <br /> 858 Pearl St.,: Lobby 100 West'.13th Ave <br /> "The Permit and Information Center 'iCity Hall <br /> Atrium Building, 99 West 10th Ave - '777 Rearl St. <br /> ALL CHANGES WILL BE MADE, EFFECTIVE JULY 01, 1996. BASED ON THE ENGINEERING NEWS-RECORD PUBLICATION, THE CITY SDC FEES <br /> REFLECT THE INCREASE IN CONSTRUCTION COSTS OF 2.15%. THE CHANGES ARE AS FOLLOWS: <br /> PAGE LOCATION CURRENT PROPOSED (effective date is Jcly 01, 19,26 <br /> 1 Section 1.0 "The figures used in the appendices are those which "The detailed analysis, figures, tables, and text. used in <br /> 4) appeared in the May 1991 adopted Methodologies. _ the appendices are those which appeared in the May <br /> They do not agree with the current fee schedule. The ~ 1991 adopted Methodologies. They do not agree with <br /> 1991 figures have been increased 2.8% in 1992, 3.7% the current fee schedule. The 1991 detailed analysis, <br /> in 1993, 5.8% in 1994, and 2.65% in 1995." figures, tables, and numeric references in the text, have <br /> been increased 2.8% in 1992, 3.7% in 1993, 5.8% in <br /> 1994, 2.65% in 1995, and 2.15% in 1996." <br /> _ - <br /> , <br /> <br />