TABLE 2 <br /> Potentia Impact Reduction and Credits for Systems Development Charges <br /> <br /> **NOTE: st of examples; eligibility depends on compliance with conditions in SDC Policies , <br /> a d Procedures document.: <br /> 1. Trapsportation System <br /> Successful bus pass program for employees <br /> Residentia <br /> Street widths > 36 Feet <br /> Commerci (/Industrial: <br /> Street idths > 44 feet <br /> Off-site, no -contiguous intersections for arterial and collector streets <br /> Transit sh er and pullout <br /> Street ligh on arterial and collector streets <br /> Off-site rig t of way and easements <br /> Traffic sign Is <br /> Off-street cycle paths identified in TransPlan or other City plans <br /> Offsite pub'c improvements where equivalent assessments can be collected <br /> 2. Wastewater System <br /> Public Wa ewater collection fines > 8-inch diameter <br /> Public pu stations and pressure Nnes that serve more than the development <br /> Offsite pub c sewer improvements, equivalent assessments - <br /> 3. Stormwater System <br /> I! Retention stem (e.g. Drywelis, and infiltration trench) <br /> Stormwate collection lines > 24-inch and 60-inch in diameter <br /> Major drai ge channels: construction and off-site easement <br /> Offsite pu c improvements where equivalent assessments can be collected or that benefit existing <br /> developme is <br /> 4. Parks System <br /> ~I land dedi lion (for sites accepted by City, consistent with adopted City Plans) <br /> Onsite pa faality dedication (for improvements accepted by City, consistent with adopted Ciiy Plans) <br /> proposed M thodologies: City of Eugene SDCs (Effective March 01, 1997) Page 23 <br /> <br />