New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 S, <br /> TABLE 1 <br /> SUMMARY OF SYSTEMS DEVELOPMENT CHARGES <br /> Transportation Wastewater Stormwater Parks <br /> Rates Cost per trip = 5665.49 Cost per Equivalent Dwelling Cost per square foot of Cost per Dwelling <br /> Unit (EDU) = S560.58 (local) impervious surtace area = Unit = 5833.43 <br /> and 5331.00 (regional). 50.148. Cost per single- <br /> Plumbing Focture Unit (PFU) family development (SFD) <br /> costs are 535.04 (local) plus with building footprint <br /> 520.69 (regional). System <3,000 sq. ft. = S475.74, or <br /> connections in River Road 23,000 sq. ft. = 5713.61. <br /> /Santa Clara and Hwy 99 per Duplex = 5951.48. For <br /> areas will pay 50.025 per Manufactured Home Parks = <br /> square foot of lot area. 5249.23 per space plus cost <br /> per square foot of additional <br /> impervious area = 50.148. <br /> COSt Ba51S Non-assessable cost Estimated non-assessable Estimated non-assessable Unit costs for <br /> per lane mile for cost of existing system using cost of existing system using various <br /> collectors and arterials; costs from "Infrastructure costs from "Infrastructure components <br /> costs of arterial street Replacement Values Report". Replacement Values <br /> lights; cost per mile for Charges are net of all federal Report". <br /> off-street bicycle paths. grants and outstanding debt. <br /> Service Level of Service "D" for Design flow standards Design standards currently Existing levels of <br /> Standards roads (675 peak hour currently used by the City for used by the City to handle a service for <br /> vehicles per lane). One various land use types. five-year storm. various <br /> light per 27 peak hour PFUs are determined using components, as <br /> VMT. 0.2268 miles of Oregon State Drainage established in the <br /> off-street bicycle path Plumbing Code. Eugene Parks <br /> per 1,000 people. and Recreation <br /> Plan. <br /> Classification Improvement Charge Reimbursement charge Improvement charge Improvement <br /> of charge n 33°~ charge <br /> Improvement charge <br /> a 67°r6 <br /> Implementation Charges for roads and Charges are on the basis of Basic SFD dwelling unit cost Charges are <br /> streetlights would be EDUs or PFUs. Existing is computed based upon based on a flat <br /> calculated based on trip commercial development assumed 35°!o impervious rate per dwelling <br /> rates for specific connecting for the first time area on 9200 square foot lot. unit for all types <br /> development types is charged based on average For SFDs with 23,000 sq. ft., of residential <br /> according to Append'a winter months' water the cost is based upon 1.5 development. <br /> C, using dwelling units, consumption, converted to times the basic SFD rate. There is no <br /> gross floor area, or EDUs. Credit for past For Duplex development, the charge for <br /> other units. Trip rates property tax payments will cost is based on 2 times the commercial <br /> capped at 10 trips per be granted for regional basic SFD rate). The cost development. <br /> 1,000 square feet or charge; credit for past trunk for a Manufactured Home <br /> equivalent. sewer levy payments will be Park is computed based on <br /> granted for the local charge. assumed 1,684 sq. ft. of <br /> (Note: for average annual impervious area per leasable <br /> discharge equal to or greater space plus the additional <br /> than 100,000 gallons per cost per square foot of all <br /> day, the Regional other impervious surtace <br /> Wastewater SDC is collected area. All other development <br /> based on a per EDU is charged based on actual <br /> standard of 200 gallons per impervious surtace area or <br /> day). equivalent surface area. <br /> <br /> Note: Administration costs are not included in the figures above. They will be added to each building permit. The administrative cost is 5.0°h of the total <br /> SDC (prior to deduction of credit). An additional $10.00 per permit MWMC administrative charge will be added to the regional Wastewater SOC. <br /> May 1, 1997 City of Eugene SDC Methodology Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.