New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ± <br /> 2.1.2.2 Existing Development , <br /> For administrative convenience, rather than verifying by physical <br /> inspection the number of plumbing fixture units in existing <br /> development that is connecting to the sanitary sewer for the first time, <br /> the base equalization charge shall be determined by using the historic <br /> winter water consumption for the existing development. Atypical <br /> single family dwelling average winter water consumption is 6,000 <br /> gallons per month. By dividing the EDU rate by six the rate per 1,000 <br /> gallons can be determined and applied to the average winter water <br /> consumption of the existing development to calculate the base <br /> equalization charge. <br /> 2.2 Administrative Charge <br /> A further adjustment to the base equalization charge is the addition of administrative <br /> costs. MWMC will incur staff costs for the updating and processing of the charge. <br /> These costs would be applied on a per connection basis. Based on estimated <br /> administrative costs and future connections, the administrative cost per permit is <br /> calculated at $10.00. Calculation of the Regional Facility Equalization Charge is <br /> illustrated in Figure 6. <br /> <br /> Febroary 24, 1993 Methodologies: City of Eugene SDCs Page D-6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.