TABLE 2 . <br /> Potential Credits for Systems Development Charges <br /> 1. Transportation System <br /> Residential: Street Widths > 36 Feet <br /> Pavement Structure > Residential Design <br /> Commercial/Industrial: Street Widths > 44 feet <br /> Non-Contiguous Intersections <br /> Transit Shelter and Pullout <br /> Extra width sidewalks for residential development <br /> Structures: Bridges/Box Culverts/Pedestrian Crossing, etc., that are not a <br /> condition of development <br /> Offsite public improvements <br /> 2. Sanitary Sewer System <br /> Sanitary Sewers > 8-inch diameter <br /> Pump stations and pressure lines that serve more than the development <br /> Offsite public improvements <br /> 3. Storm Sewer System <br /> Storm sewers > 24-inch and < 60-inch in diameter <br /> Retention or detention ponds <br /> Major drainage channels: construction and easement <br /> Major culverts > 24-inch <br /> Drywells - on building site <br /> Offsite public improvements <br /> 4. Parks System <br /> Land dedication <br /> Onsite facility dedication (for public facilities) <br /> <br /> February 24, 1993 Methodologies: City of Eugene SDCs Page 15 <br /> <br />