New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-02-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-02-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:09:17 PM
Creation date
8/15/2008 11:04:26 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
4/30/1997
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 3 . <br /> Transportation Systems Development Charge Analysis <br /> 1 Analysis of Transportation System <br /> EpgenelSpringfield metropolitan average vehicle trip length 4.38 <br /> Eugene trip and peak vehicle miles; percentage on Eugene's arterial and collector streets 0.35 <br /> T tal lane miles of arterlai and collector system, excluding turn lanes [arterial = 59.4%; collector =40.6% j 404.12 <br /> Average number of lanes per mile of arterials and collectors 3.26 <br /> E ene avers a one wa trl len th for arterial and collectors miles er trl 4.38.0.45 ' '/z 0.7665 <br /> . Arterial and Collector Street System Analysis (Linear Mlle Costs): <br /> fisting level of service "D" for Roads; number of vehicles per hour (capacity per lane mile) 675 <br /> near Section Total Construction Costs: <br /> ar Typical collector street width 46 feet n Typical arterial street width 66 feet <br /> a? Typical collector construction cost per linear feet $241.02 s Typical arterial construction cost per linear feet $337.27 <br /> at Total cost per linear mile, 46' collector ~ Total cost per linear mile 66' arterial <br /> $241.023.5,280 linear feet per mile] $1,272,601 [ $337.273 " 5,280 linear feet per mile] $1,780,801 <br /> <br /> A elrage Linear Section Costs: <br /> ~ Aiverage construction cost per linear mile ~ Average construction cost per linear foot <br /> ~ ($1,272,601 ".406) + ($1,780,801 • .594) ] $1,574,472 [ $1,574,472 / 5,280 linear feet per mile) $298'20 <br /> average non-assessable cost i linear mile [53.9%] $848,641 r Average assessable cost /linear mile (46.1%] $725,832 <br /> ~Nvert#ge non-assessable cost per linear foot a Average assessable cost per linear foot <br /> i ['$848,641 / 5,280 linear feet per mile ] $160.73 [ $725,832 / 5,280 linear feet per mile j $137.47 <br /> sessable and Non-assessable Costs: <br /> ~ Non-assessable cost per lane mile {excludes n Assessable cost per lane mile {excludes <br /> administration and engineering charges} $260,319 administration and engineering charges} $222,648 <br /> [$848,641 / 3.26 (average # of lanes per mite) ] ($725,832 / 3.26 (average # of lanes per mile) ] <br /> Non-assessable administration/engineering a Assessable administration/engineering costs <br /> costs applied ($260,319 " .25 ] $65,080 applied ($222,648 " .25 ] $55,662 <br /> ' ~~u .ot I,~'V tls~~s~ta>wpi+~i;~~st fief l,~di~'eMlle,~~'' r-~~3fZ5 39~t~ n Total Assessable Cost per Lane Mile 6278 310 <br /> :s,`~a`E. ~280R~19ka'~.t~~6~~0~a.~ ~a}`~~~,, t [ 5222,848 + 655,662 ] <br /> I to section Costs (based on the linear foot unit costs and the average number of intersections per lane mile): <br /> ost per lane mile {excluding administration ~^~,;Cost per:;aane tulle t incltdln~ engineering <br /> $38,117 ~ ~ 647 848 <br /> nd 9ngineering costs } ~r;~administration'costs } (38,117 ".0;35)] , <br /> T a is ignal Costs: <br /> Signalized intersections in Eugene system 144 n Total # intersections with traffic signals 198 <br /> i _ <br /> id <br /> i <br /> i <br /> i I <br /> i <br /> i' <br /> 'd. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.