4 ^ <br /> FIGURE 2 <br /> TRANSPORTATION SYSTEM <br /> STREETS <br /> Level of Service <br /> LOS D as specified System Value <br /> in TransPlan <br /> Impact measurement Non-assessable <br /> construction cost <br /> D Trips generated per lane mile <br /> D Vehicle mile traveled <br /> Formula: <br /> . Cost of Service (PER TRIP) <br /> Miles per trip Cost Cost <br /> X per = per <br /> Capacity per lane mile lane mile trip <br /> <br /> Note: The cost per trip, can be found in the current adopted SDC fee schedule in Appendix G. <br /> March 01, 1997 Methodologies: City of Eugene SDCs Page C-4 <br /> <br />