~ ~ <br /> ~ a Attachment #3 of Exhibit A <br /> Administrative Order No. 58-97-07-F <br /> Page 1 of 1 <br /> . FIGURE 1 <br /> ate Settin Methodoio _ <br /> <br /> . g ~Y <br /> Le el of Service System Value <br /> Impact m asurement Replacement costs for <br /> existing reserve capacity <br /> a Equival nfi dwelling units, (EDU) (plus) <br /> Plumbi g fixture units (PFUs) Projected future <br /> a Flow E tirrmation Unit (PFUs) expenditures <br /> a Impervi us surface (minus) <br /> Assessable costs <br /> a Trip rat s <br /> (equals) <br /> .a Numbe of employees SDC eligible costs <br /> - Formula: <br /> Cost of Service <br /> SDC eligible costs SDC <br /> (PER UNIT <br /> OF SERVICE) <br /> Impact measurement <br /> Apply SDC to <br /> specific types <br /> of development <br /> July 7, 1997 City of Eugene SDC Methodology Page 5 <br /> <br />