_ <br /> ~ <br /> I short, the pro sed SDC is intended to recover the full costs of the use of the capacity of the <br /> r gional system y new development. The SDC methodology forwarded by the Metropolitan <br /> astewater Man ement Commission to the Cities of Eugene and Springfield for adoption does <br /> ake major ch es in the way those costs are recovered. I have enclosed a copy of the agenda <br /> i em on the prop sed SDC from the April meeting of the Metropolitan Wastewater Management <br /> ommission, an a copy of a public information sheet developed jointly by the two Cities that <br /> <br /> provides some v ry summary information on the proposed SDC and the adoption process. <br /> <br /> F~,lease give me a all at 682-5257 if you would like additional information on the proposed <br /> <br /> r~et~odology. <br /> Sincerely, <br /> Svendsen <br /> len <br /> cting Deputy D ector <br /> <br /> enclosures <br /> <br /> c : Vicki El er, City Manager <br /> Les Lyle, City Engineer <br /> I <br /> <br />