2.C.2 Plans an Drawin s <br /> ptue to the large variety of uses for revocable permits, the plans and drawings to be <br /> required for a p rmit will be addressed on a case-by-case basis. Contact the staff of the <br /> City Engineer fo specific requirements. <br /> ~.~.3 Review <br /> irngineering Div sion personnel have the responsibility of entering the permit information <br /> o a permit tra king system, routing the applications to the various reviewing divisions, <br /> d then issuin the permit. If aright-of--way cut permit is required in addition to the <br /> re ocable permi ,the right-of--way cut permit must be reviewed and approved by the Utility <br /> ~n pector prior t the issuance of the revocable permit. <br /> fife amount of t me needed by the City of Eugene to review a revocable permit varies <br /> grjeatly dependi g upon the complexity of the individual permit situation. <br /> copy of all pe its granted shall be forwarded to the Utility Inspector in Maintenance <br /> ~I~nning to alto inspection of the right-of--way restoration and temporary traffic control <br /> ~n~asures used. <br /> 1D STREET AND RIGHT-OF WAY CUT PERMITS <br /> ~2.p.1 A licat on <br /> ~i <br /> F r EWE6, fran hised utilities, and licensees, application to perform excavations within <br /> h public way ay be made to the Engineering Division at 858 Pearl Street. All other <br /> ri ht-of--way us and cut permits are issued through Engineering staff at the Permit and <br /> In ormation Ce er at 99 W 10th Avenue. Applications shall be made on a standard form <br /> p ovided by the City. All relevant portions of application form and standard attachments <br /> ust be comple ed prior to submittal to the City. Incomplete applications will not be <br /> p ocessed and ill be returned to applicant. " <br /> ~A plication for right-of--way cut permit must be made by a representative of the owner or <br /> o erator of the acility being installed or upon which maintenance is being performed. <br /> P rsons or com anies working under contract to the facility owner or operator are not <br /> c nsidered repr sentatives of the facility owner and as such will not be allowed to apply <br /> <br /> ` f r or be grante aright-of--way cut permit. <br /> U less a speci I exception is granted, applications for right-of--way cut permits to perform <br /> ;e~CCavations up n improved streets shall not be granted where the pavement is less than <br /> fiWe years old. <br /> ~r. <br /> j U{ility & R/1JV Permit olicy 9 06/01/97 <br /> 3 <br /> 1 <br /> E <br /> I <br /> <br />