<br /> II <br /> <br /> Ill <br /> <br /> it RIGHT-OF-WAY USE PERMIT FEES <br /> - <br /> <br /> i Effective July 1, 1997 <br /> Permit Tvue• <br /> C Drivew y -residential $ 60.00 <br /> Drivew y -commercial 75.00 <br /> Each a ditional 25.00 <br /> Drivew y -repair of driveway access <br /> sl built to Ci standards 40.00 <br /> i revi u <br /> Y tY <br /> P <br /> Sidewa k -residential 60.00 <br /> Sidewa k -commercial 60.00+ <br /> Addit oral for each square foot in <br /> the ar a over 400 square feet 0.10 sq/ft <br /> Sidewa -repair of sidewalk <br /> previ usly built to City standards 40.00 <br /> Revoca le permit 125.00 <br /> Excava ion -with building permit 25.00 <br /> Excava ion -without building permit 165.00 <br /> Excava ion -utilities Use right-of-way <br /> Permit Fee Schedule <br /> Buildi Moves: <br /> Gara e 100.00 <br /> 1 Sto Building 100.00 <br /> 1 & 1 2 Story Building 100.00 <br /> 2 Sto Building 100.00 <br /> Dista ce charge -per block in <br /> exc ss of five blocks no addi. charge <br /> Tempo ary Right-of--Way Use 35.00 minimum <br /> ~I Resid ntial 0.02 sf/week <br /> Co ercial 0.04 sf/week <br /> Long- erm Use of the Right-of--Way <br /> Surfa a (No air or subsurface rights) $ 0.15 sf/year <br /> Mi ' um one-year fee required <br /> D e T st $ 30.00 <br /> y <br /> <br /> i'~ <br /> Exhibit A - 1 <br /> <br /> I' <br /> <br />